Similar Projects
Last Updated | 02/14/2022 12:15 PM |
Project Title | Roof Replacement at Saraland Operations Center |
Physical Address | View project details and contacts |
City, State (County) | Saraland, AL 36571 (Mobile County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope Of Work: Remove the existing skylight panels, ridge vents, plumbing pipe boots, eave and rake trim. Replace the skylight panels with new R-Panels. Close ridge vent openings and bridge the internal gutter with sheet metal so as to provide a suitable deck system as required to install a single ply roof system. Install 2x6 perimeters as required for attachment of the roof membrane and associated eave and rake trim. Install R-Panel flute filler and cover board insulation attached through the roof and into the support purlins. Install a water diverting cricket on the warehouse roof section, eliminating the internal gutter. Install 60 mill TPO single ply membrane roof system to include custom fabricated eave and rake trim. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |