Similar Projects
2023 Water Treatment Plant & Raw Water Intake Improvements, Ground Storage Tank, & Booster Pump Station
Infrastructure
Bidding
$1,000,000 CJ est. value
Lexington, MI 48450

2023 Water Treatment Plant & Raw Water Intake Improvements, Ground Storage Tank, & Booster Pump Station
Infrastructure
Bidding
$1,000,000 CJ est. value
Lexington, MI 48450

Carsonville-Port Sanilac Schools Storage Facility
New Construction, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Carsonville, MI 48419

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Parking Lot Improvements - HMA and Concrete Repairs
Infrastructure, Alteration
Results
MI

Parking Lot Improvements - Crack Sealant, Sealcoating, Pavement Markings and Signage
Infrastructure
Results
MI

Sanitary Sewer Pipe Rehabilitation
Infrastructure
Bidding
$270,000 CJ est. value
Lexington, MI 48450

Up to 196.32 Lnmi of Hot Mix Asphalt Crack Treatment
Infrastructure
Post-Bid

2022 Water Main Replacement
Alteration
Results
Brown City, MI

Croswell Wastewater System Improvements Contract 1: WWTP and LS Improvements
Renovation, Infrastructure
Bidding
$6,000,000 CJ est. value
Croswell, MI 48422

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Huron Avenue Pump Station Rehabilitation
Renovation
Results
$463,317 CJ est. value
Lexington, MI 48450

Water System Upgrades Elevated Water Tower, New Raw Water Main, Water Meter Replacements, Water Supply
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Carsonville, MI 48419

Track Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Carsonville, MI 48419

Last Updated 06/14/2023 12:33 AM
Project Title

2023 Sanitary Sewer System Improvements;Gravity Sewer, Force Main, Pump Station Construction & Rehab, and Lagoon Rehab

Physical Address View project details and contacts
City, State (County) Lexington, MI 48450   (Sanilac County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,503,267 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes multiple upgrades to the existing Village of Lexington Sanitary Sewer System including: Gravity Sewer construction along Altona Drive and M-25 to Birch Drive. Constructing a new Lift Station and force main to the lagoon. Replacing the existing force main from the Boynton Lift Station to the Lagoons. Rehab work at the existing Huron Lift Station and Mobile Home Park Lift Station. Rehab work to the existing lagoon system including: re-grading banks, rip rap, and valve structure rehab. Bid-Result Division #1 - Altona, M-25, Birch Gravity Boddy Construction Co. : $967216 Division #2 - Lift Station and Forcemains Boddy Construction Co. : $2036823 Division #3 - Lagoon System Rehab Boddy Construction Co. : $499228

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents