Similar Projects
Central Drive Duplex
New Construction
Conception
$800,000 est. value
Gallatin, TN 37066

Indian Lake Village Apartments
New Construction
Design
Hendersonville, TN 37075

Tomkins Farm Phase Ii
New Construction
Design
$13,000,000 est. value
Gallatin, TN 37066

Valvoline Oil Change / Gallatin
New Construction, Infrastructure - 2,080 SF
Bidding
$500,000 CJ est. value
Gallatin, TN 37066

Valvoline Oil Change / Gallatin
New Construction, Infrastructure - 2,080 SF
Bidding
$500,000 CJ est. value
Gallatin, TN 37066

Sanders Ferry Adult Living Community
New Construction
Post-Bid
Hendersonville, TN

Hendersonville Senior Center Paving Improvements
Infrastructure
Post-Bid
$498,000 est. value
Hendersonville, TN

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Resurfacing on US 31w (SR. 41)
Results
TN

Aintree Apartments
New Construction
Pending Verification
Gallatin, TN 37066

Walnut Crest Townhomes
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Gallatin, TN 37066

Costco - Glenbrook South / Hendersonville
New Construction, Infrastructure
Design
$22,000,000 CJ est. value
Hendersonville, TN 37075

Sumner County Maintenance Facility New
New Construction, Infrastructure - 18,750 SF
Bidding
$300,000 CJ est. value
Gallatin, TN 37066

Annual Asphalt Repair
Term Contract
Post-Bid
Hendersonville, TN

Concrete Pad at Fire Station 3
Demolition, Alteration
Results
$15,000 to $20,000 est. value
Gallatin, TN 37066

Last Updated 08/23/2022 03:05 PM
Project Title

Revery Point at Foxland Harbor Phase III

Physical Address View project details and contacts
City, State (County) Gallatin, TN 37066   (Sumner County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $24,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of 1-4 buildings. As of August 23, 2022 the project is in design with an anticipated construction start of first quarter 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents