Similar Projects
SC 901 (Edgeland Rd) from SC 9 (Lancaster Highway) to approx Victorian Hills Drive
Infrastructure
Conception
$716,000 CJ est. value
Richburg, SC 29729

Richburg Magnolia Industrial Spec Building 2
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Richburg, SC 29729

Chester Area High School Track Resurfacing Project
New Construction
Post-Bid
$50,000 est. value
Chester, SC

Chester County School District CIP - District Career Center
New Construction, Infrastructure
Post-Bid
$30,000,000 CJ est. value
Chester, SC 29706

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Linden Drive Water Line Replacement Project
Infrastructure
Results
$489,100 CJ est. value
Chester, SC 29706

Cheswick Residential Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Richburg, SC 29729

Interstate 77 Industrial
New Construction, Infrastructure - 800,000 SF
Pending Verification
$86,400,000 CJ est. value
Chester, SC 29706

Chester County School District CIP - New Chester High School
New Construction, Infrastructure
Post-Bid
$50,000,000 CJ est. value
Chester, SC 29706

Bridge Maintenance
Infrastructure
Results
$2,549,856 CJ est. value
Fort Lawn, SC 29714

Lithium Hydroxide Processing Facility (Project Raven)
New Construction, Infrastructure
Pending Verification
$1,300,000,000 CJ est. value
Richburg, SC 29729

Chester County School District CIP - New CHS Stadium and Sports Complex
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Chester, SC 29706

IKO Industries Manufacturing Plant
New Construction, Infrastructure - 325,000 SF
Pending Verification
$300,000,000 CJ est. value
Chester, SC 29706

Chester County School District CIP - Lewisville Elementary Expansion
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$30,000,000 CJ est. value
Chester, SC 29706

Chester County School District CIP - New Lewisville High School
New Construction, Infrastructure
Post-Bid
$50,000,000 CJ est. value
Chester, SC 29706

Last Updated 05/30/2023 05:07 PM
Project Title

Chester County School District CIP - LHS Athletic Improvements

Physical Address View project details and contacts
City, State (County) Chester, SC 29706   (Chester County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected August 2024
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for upgrades to an existing sports complex: - New Baseball & Softball Field with combined Press Box, Batting Cages, and Field House - Javelin/Pole Vault Practice Areas - Band Practice Field - (4) Tennis Courts - LHS Stadium upgrades to include Resurfacing Of Existing Track, New Turf Field, New Field House and Renovation Of Existing Press Box As of May 30, 2023, this project was approved by the school board. Currently there are no submissions to the South Carolina Office of School Facilities for approval. An architect and construction manager have been selected. Information regarding subcontractor bidding has not been disclosed. A firm timeline has not been released, however construction should start before the end of 2024. The components of the $263 million Chester County School District CIP include the following: District Career Center (Phase II and III - Phase I is paid for through bonding capacity) New Chester High School New CHS Stadium and Sports Complex Lewisville Elementary Expansion New Lewisville High School LHS Athletic Improvements GFES Renovations and Additions GFHS Renovations and Additions GFHS Athletic Improvements *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents