Reported | 06/10/2021 12:00 AM |
Project Title | Taurus Way Connector |
Physical Address | View project details and contacts |
City, State (County) | Bainbridge, GA 39817 (Decatur County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes roadway, gravity sanitary sewer and water main infrastructure improvements. The total length of the roadway section of the project is 1, 997 feet or 0.38 mile and runs between Taurus Way and Butler Ferry Road at its intersection with Commodore Industrial Boulevard. Improvements include construction of a 2-lane 24-foot wide asphalt ditch section roadway and associated storm drainage culverts and storm sewer. The total length of the gravity sanitary sewer extension is 1,657 If of 8" PVC and includes 5 manholes and a connection to an existing pump station. Approximately half of the sanitary sewer extension runs west from the existing pump station paralleling the north side of Butler Ferry Road and half runs north from Butler Ferry Road paralleling the eastside of the new roadway. The total length of the water main is 2,150 If and includes 1,957 If 10-inch PVC, 67 If of horizontal directional drilled (HDD) 10- inch HDPE, 63 If 6" PVC water line, 63 If 4" PVC water line and 5 fire hydrants The Contract includes erosion, sedimentation & pollution control for approximately 6.0-acres of disturbed area. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |