Similar Projects
RFQ Design - Active Learning Classroom Improvements, Phase 2
Renovation
Bidding
$1,000,000 CJ est. value
Boise, ID 83725

RFQ - General Surveying Services
Term Contract
Bidding
Meridian, ID 83642

ARPA Design Services for Greenbelt Pathway Riverbank Stabilization and Erosion Control 2022
New Construction, Infrastructure
Post-Bid
Boise, ID

ARPA Design Services for Greenbelt Pathway Riverbank Stabilization and Erosion Control 2022
New Construction, Infrastructure
Post-Bid
Boise, ID

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFQ Design - Apple Maintenance and Operations Facilities Design
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Garden City, ID 83714

RFP Engineering - FY24 Roadway and ADA Improvements
Infrastructure
Bidding
$7,000,000 CJ est. value
Boise, ID 83702

Architect-Engineering Services to Support The Us. Air Force and AFECE Environmental Program Worldwide "AE ES 2022"
Term Contract
Post-Bid

Miscellaneous Civil Engineering Services
Infrastructure
Results
Boise, ID

RFQ - ARPA Design Services for Expo Idaho, Ada County Jail, and 400 Benjamin RTU Replacements
Renovation
Bidding
$300,000 CJ est. value
Boise, ID 83704

Catastrophic Housing Plan
Alteration
Post-Bid

The Watershed- Exhibit Design Services
New Construction, Infrastructure
Results
$450,000 est. value
Boise, ID 83714

RFP Design - Kuna Library Addition
Addition, Demolition, Infrastructure
Bidding
$700,000 CJ est. value
Kuna, ID 83634

Student Residence Hall
Renovation, Alteration
Post-Bid
$43,500,000 est. value
Boise, ID

Last Updated 07/07/2023 11:02 AM
Project Title

RFQ - D/B Albertson's Stadium North End Zone Addition Boise State University

Physical Address View project details and contacts
City, State (County) Boise, ID 83706   (Ada County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $289,500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

RFQ submittal packages will be received at the Division of Public Works for furnishing Design-Build services to the State of Idaho. All questions must be sent to the DPW Project Manager: Martin Santoyo, Project Manager Division of Public Works 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208) 332-1913 Martin.Santoyo@adm.idaho.gov Funding for the project is from the State. The proposed construction budget must be approved by the State Board of Education prior to proceeding to the construction phase of the Project. In the event approval is not obtained and/or the University does not obtain the required funding for the Project to continue, the Project may be delayed or terminated prior to commencement of construction without penalty to the State or Boise State University. The Division of Public Works (DPW) will administer the project according to the terms and conditions of the award, State laws and guidelines. The Design-Build team will receive general instructions through the State. A Project Manager from DPW will be assigned to serve as project manager and liaison between the Depaiiment of Administration, the Agency, and the Design-Build team. A concephial design study (reference images attached) was previously completed; however, it is not intended to represent the final design. Prior involvement in the study does not preclude AECOM from participation in the selection process for this project. The Design-Build team shall warrant the following: not knowingly hire or engage any illegal aliens or persons not authorized to work in the United States as required by Title 67, Chapter 79, Idaho Code. The Design Professional shall take steps to verify that it does not hire or engage any illegal aliens or persons not authorized to work in the United States; and that any misrepresentation in this regard or any employment of persons not authorized to work in the United States constitutes a material breach and shall be cause for the imposition of monetary penalties and/or termination of any Contract resulting from this RFQ. The North Encl Zone project will infill existing bleacher seating on the north of Albertson's Stadium with premium seating including loge boxes and field level suites, additional of general admission seating, and construction of a dining hall and club room for Boise State University student athletes. The intent of the North Encl Zone project is to address current structural deficits to improve the fan experience including improving entrance efficiency and limiting or eliminating queues at the stadium gates, expanding pre1niun1 seating with tl1e stadiun1 including nev,r field-level suites, i1nproving concourse circulation, and adding additional restroom facilities, concession stands. Operationally, the project will address critical need areas including visiting team facilities, a full training table kitchen and dining area, improving storage, adding flexible office/classroom space, while allowing for premiere access for event set and strike as the stadium will seek to generate additional revenue by hosting concerts and other large entertainment events. A total project budget for planning and _the design phase is approximately $2,405,000. The target Design-Build contract project budget for construction is approximately $28,900,000.00. A relatively complete construction cost estimate will be required following the Schematic Design Phase and must be updated at each additional design phase. The Construction budget and construction of the project is fully conditioned and contingent on the approval by University and the State Board of Education prior to proceeding to the Construction Phase. As of July 7, 2023, an issuance of short-listed firms has not been released. The design build team selection timeline has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents