Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

Contractor - Hart Mountain National Antelope Refuge (HMNAR) Grade Road Restoration
Infrastructure
Design
Plush, OR 97637

OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Bidding
$7,473,223 est. value
Roseburg, OR 97471

Haines Water Compliance Project - Phase 3
Infrastructure
Bidding
$280,000 est. value
Haines, OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

Fire Department Station No. 2 Parking Lot Improvements
Infrastructure
Bidding
$70,000 est. value
Coos Bay, OR 97420

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

2022 Street Rehabilitation
Infrastructure
Bidding
$402,983 est. value
Prineville, OR

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

South East Canyon Street Improvements
Infrastructure
Bidding
$115,000 to $145,000 est. value
Canyonville, OR 97417

Last Updated 05/30/2022 04:37 AM
Project Title

2022 Paving Improvements at Hwy 155 (Ferry Street) Sidewalk Improvements, 9th Street to Flower Lane

Physical Address View project details and contacts
City, State (County) Dayton, OR 97114   (Yamhill County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Hwy 155 (Ferry Street) Sidewalk Improvements, 9th Street to Flower Lane.The work includes the following: Curb, sidewalk and storm drainage improvements along the north side of Hwy 155 (Ferry Street) from 9th Street to Flower Lane (+-1350 feet), including inter section pedestrian ramps

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents