Similar Projects
Wastewater Treatment Plant Upgrade Phase 2 - City of Kennewick
Renovation
Conception
$28,870,000 CJ est. value
Kennewick, WA 99336

West Hill Springs Water Quality Improvements - City of Auburn
New Construction, Infrastructure
Conception
$480,000 CJ est. value
Auburn, WA 98002

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

RFP D/B - Water Treatment Plant for the Bullman Beach Water System
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Port Angeles, WA 98363

EQ Basin Expansion and Sewer Receiving Station project
Renovation
Bidding
$855,000 CJ est. value
Battle Ground, WA 98604

Moderate Risk Waste Facility (MRWF) Retrofit
New Construction
Post-Bid
Kennewick, WA 99336

WWTP Ultraviolet Disinfection Replacement
New Construction
Post-Bid
$1,400,000 to $1,700,000 est. value
Leavenworth, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

WWTP Digester 4
New Construction
Results
$13,244,000 est. value
Wenatchee, WA

RFP Construction Manager - GC/CM Services for West Point Treatment Plant (WPTP)
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Seattle, WA 98199

Bujacich Sewage Lift Station 17 - City of Gig Harbor
Renovation, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Gig Harbor, WA 98335

Vegetation Sorting Facility - sdbd12 - City of Auburn
Build-out
Conception
$152,000 CJ est. value
Auburn, WA 98002

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

Pe Ell Wastewater Treatment Plant and Lift Stations Upgrade
Renovation
Bidding
$674,000 CJ est. value
Pe Ell, WA 98572

Last Updated 04/07/2023 12:05 AM
Project Title

Central Treatment Plant Secondary Clarifier #5 Restoration Project

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98421   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,436,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes but is not limited to the furnishing of all labor, materials, supervision, tools, and equipment necessary to clean, demo, resurface, restore, replace corrode metal, and install one high performance secondary clarifier coating system on secondary clarifier #5. Addition work required to replace electrical, mechanical switches, indicators, shear pins, and manifold seals on all six (6) secondary clarifiers located at the City of Tacoma's Central Wastewater Treatment Plant (CTP). Estimate: $1,333,500.00 : Requests for information regarding the specifications may be obtained by contacting Dawn DeJarlais, Senior Buyer by email to ddejarlais@cityoftacoma.org "The City of Tacoma" in accordance with provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin in consideration of award.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents