Similar Projects
SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

SR 132 Water Service Connections
Infrastructure
Bidding
$304,325 CJ est. value
Batavia, OH 45103

Amelia-Olive Branch Road Sidewalk Phase 2
Infrastructure
Bidding
$186,952 CJ est. value
Batavia Township, OH 45102

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Charity Street Reconstruction
Results
$367,269 est. value
Bethel, OH

2021 Street Repair Program
Results
OH

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

US 52/232 Culvert Construction/Reconstruct/Repair
Infrastructure
Design
$336,697 CJ est. value
Batavia, OH 45103

Goshen Township Road 74 Resurfacing Project
Infrastructure
Post-Bid
Goshen, OH

Chilo Street Improvements
Results
$88,829 est. value
Chilo, OH

SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

Goshen Township Fire Station
Infrastructure
Post-Bid
$492,671 est. value
Milford, OH 45150

Gay Street Reconstruction Phase 2
Results
$944,828 est. value
Williamsburg, OH

Last Updated 10/07/2022 03:04 PM
Project Title

Miami Township Milford Hills Intersection Widening Project

Physical Address View project details and contacts
City, State (County) Milford, OH 45150   (Clermont County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of: 2022 Miami Township Milford Hills Intersection Widening Project This project consists of: Under this contract the successful bidder shall furnish all labor, materials and equipment necessary for performing and completing the required improvements as stipulated in the plans and specifications. and consisting of the cover sheet, general notes with profile and estimated quantities, and the grading plan. The Contractor shall provide all the labor and furnish all the materials, except as herein otherwise specified, necessary for properly performing and completing the work per the itemized construction activities listed in the plans and on the "Quantity Estimate and Bid Tabulation" page of this document. The methods, materials, and appliances used therefore shall conform to the current edition of the State of Ohio Department of Transportation Construction and Materials Specifications. These specifications can be found on the ODOT website listed below: Note: Excavation/Embankment Payment: Payment for excavation and embankment of dirt, including any necessary haulOoff shall be incidental to the remainder of the project. Any items required, including labor, equipment, and/or materials, but not shown as a separate pay item in the proposal, shall be furnished and installed as incidental to the contract, except where noted in the plans and specifications. All work shall be completed between April 3, 2023 and June 30,2023. The Contractor shall provide all the labor and furnish all the materials necessary for properly performing and completing the work of the Contract. http://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/2019-Online-SpecBook.aspx The successful bidder must provide all materials, manpower, and equipment (including mobilization) to enlarge the radius at the northeast corner of SR 28 and Milford Hills Drive. Curb ramp and sidewalk will be replaced on the northeast side. New curb will match existing type. Utility pole on northeast corner will be relocated by the appropriate utility company. Existing pavement on Milford Hills within project limits will be milled and replaced according to the plans and specifications labeled: The Trustees reserve the right to add or delete footage and or tonnage of the project as specified in the plans.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents