Similar Projects
Coconino Estates Phase II Improvements
Bidding
Flagstaff, AZ

Road Construction IDIQ - Coconino & Kaibab National Forests
Bidding
$1,000,000 to $10,000,000 est. value
Flagstaff, AZ 86001

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Antelope Canyon Resort & RV Park
Post-Bid
Page, AZ

Job Order Contracting Services
Term Contract
Results
Less than $226,000 est. value
Flagstaff, AZ

Construction - NFSR 300 Road Surface & Stabilization
Results
$250,000 to $500,000 est. value
AZ

Tuba City Shopping Center - Asphalt Parking Lot
Renovation
Construction
Tuba City, AZ 86045

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Pavement Seals Project FY 20
Results
Less than $600,000 est. value
Page, AZ 86040

Construct Turn Lane
Results
Less than $1,340,000 est. value
Flagstaff, AZ 86011

Pavement Preservation
Results
Less than $4,610,000 est. value
AZ

AZ NPS PP GRCA 2019(2), Pavement Preservation Grand Canyon
Results
$10,000,000 to $15,000,000 est. value
AZ

Asphalt 2020
Results
Flagstaff, AZ 86011

Left Turn Lane
Results
Less than $855,000 est. value
Page, AZ 86036

DEMA Camp Navajo Pavement Maintenance Single
Term Contract
Results
Less than $1,000,000 est. value
Bellemont, AZ 86015

Last Updated 01/20/2020 02:03 AM
Project Title

Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) AZ   (Coconino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is located in Coconino County, on State Route 64 near the community of Valle. The project begins at Milepost 205 and extends north along SR 64 to Milepost 213. The project consists of pavement rehabilitation and feasible safety enhancement. The proposed work includes mill and replacement of pavement, shoulder build-up, embankment slope flattening, new pavement marking and striping, new rumble stripping, new guardrails, culvert extension, seeding and other miscellaneous work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earth Stripping and Stockpiling.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Turf and Grasses, Seeding.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents