Similar Projects
$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Montevallo Water Treatment Plant - Residential and Commercial Water Meters
Infrastructure
Design
$9,500,000 CJ est. value
Montevallo, AL 35115

Inverness Park Sewer Rehab
Infrastructure
Bidding
$125,000 CJ est. value
Birmingham, AL 35242

Inverness Center Drive Sidewalk Phase I
Infrastructure
Bidding
$400,000 CJ est. value
Hoover, AL 35242

Digital LED Video Wall Package
Renovation
Sub-Bidding
$100,000 CJ est. value
Alabaster, AL 35007

Overland Tank Interior Painting
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Montevallo, AL 35115

USPS IQ JOC - Alabama
Renovation
Post-Bid
$10,000 to $10,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

New School - Pelham City Schools
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Pelham, AL 35124

The Canopy Mixed-Use Development
New Construction, Infrastructure - 25,000 SF
Pending Verification
$50,000,000 CJ est. value
Pelham, AL 35124

Naaman Clinic Surgical Dermatology
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Hoover, AL 35242

Cosby Building - Phase 1
Renovation
Bidding
$500,000 CJ est. value
Calera, AL 35040

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Last Updated 08/12/2022 03:03 PM
Project Title

Construction of Harpersville Mayors Office

Physical Address View project details and contacts
City, State (County) Harpersville, AL 35078   (Shelby County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of: The turn key Construction of the Harpersville Mayor's Office as indicated in the Specifications and Drawings. Bidders will be required to provide Bid security in the form of a Bid Bond or cashier's check in the amount of a sum no less than five (5) percent of the Bid Price. The owner requires the Project to be complete within 120 working days from date indicated on the notice to proceed. Your Bid will be required to be submitted under a condition of irrevocability for a period of sixty (60) days after submission. The attention of bidders is called to the provisions of State Law Governing General Contractors, as set forth in Sections 34-8-1 to 34-8-24, inclusive, Code of Alabama of 1975, as amended; and the provisions of said law shall govern bidders insofar as it is applicable. The above-mentioned provisions of the Code make it illegal for the Owner to consider a bid from anyone who is not properly licensed under such code provisions. The Owner, therefore will not consider any bid unless the bidder produces evidence that he is licensed. Neither will the Owner enter into a Contract with a foreign corporation which is not qualified under State Law to do business in the State of Alabama. The attention of non-resident bidders is called to the provisions of Alabama Law, Section 39-3-5, Code of Alabama 1975, as amended, relating to preference to be given to resident contractors in Alabama over non-resident contractors in the award of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the non-resident contractor, and to the requirements that the bid documents tendered by any non-resident contractor must be accompanied by "a written opinion of an attorney-atlaw licensed to practice law in such non-resident contractor's state of domicile as to the preference, if any or none, granted by the law of the state to its own business entities whose principal places of business are in that state in the letting of any or all public contracts." Bidding contractor will be required to provide evidence of E-Verify documentation and Section 84 business license. By signing this contract, the contracting parties affirm, for the duration of the agreement, that they will not violate federal immigration law or knowingly employ, hire for employment, or continue to employ an unauthorized alien within the State of Alabama. Furthermore, a contracting party found to be in violation of this provision shall be deemed in breach of the agreement and shall be responsible for all damages resulting therefrom. By signing this contract, vendor agrees that it is not currently engaged in, nor will it engage in, any boycott of a person or entity based in or doing business with a jurisdiction with which the State of Alabama can enjoy open trade. Please provide your bid response in triplicate, one original and two copies. The Owner reserves the right to accept or reject any or all Bids.

Details

1 Story Above Grade, 2,865 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents