Similar Projects
Upgrade or Ventilation Fy22 NRM
Alteration
Design
$1,000,000 to $5,000,000 est. value
Loma Linda, CA 92354

Arrowhead Village, Cooling Tower Replacment
Alteration
Bidding
$150,000 est. value
San Bernardino, CA 92407

East Wing Mechanical Improvements
Renovation
Bidding
$4,500,000 CJ est. value
San Bernardino, CA 92410

District Warehouse Freezer Replacement
Renovation
Sub-Bidding
$322,890 CJ est. value
Ontario, CA 91762

HVAC Upgrades at Cope Middle School
Renovation
Sub-Bidding
$200,000 CJ est. value
Redlands, CA 92373

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

District Wide HVAC Replacements 11 Campuses (COVID) - HVAC
Alteration
Results
$13,500,000 est. value
Hesperia, CA 92344

Cooling Tower Pump Repair
Alteration
Results
San Bernardino, CA

HVAC Upgrade at Silverado High School
Alteration
Post-Bid
Victorville, CA 92395

HVAC Repair Services in Riverside and San Bernardino Counties
Term Contract
Results

Heating Ventilation and Air Conditioning Services
Alteration
Post-Bid
CA

Preventive Maintenance of HVAC, Exhaust fans, Chillers, Cooling Towers
Term Contract
Results
Loma Linda, CA 92357

Career Training Center (CTC) Building 200 HVAC Removal and Replacement
Alteration
Post-Bid
Ontario, CA 91762

AVUSD: HVAC Replacement at Five Various Sites - Phase 2 Project
Alteration
Results
$500,000 est. value
Apple Valley, CA

Last Updated 09/21/2022 09:31 PM
Project Title

Jerry Lewis Family Swim Center Pool Heaters Replacement

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92404   (San Bernardino County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $166,700 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 24th, 2022, project has not been awarded. It is expected to be awarded sometime after September 20th. PREVAILING WAGE: Notice is hereby given that in accordance with the provisions of California Labor Code, Division 2, Part 7, Chapter 1, Articles 1 and 2, the Contractor is required to pay not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work. In that regard, the Director of the Department of Industrial Relations of the State of California is required to and has determined such general prevailing rates of per diem wages. Copies of such prevailing rates of per diem wages are on file in the office of the City Engineer, 201 North "D" Street, San Bernardino, California, and are available to any interested party on request. The City also shall cause a copy of such determinations to be posted at the job site. YOU MUST SUBMIT with your proposal cash, cashier's check, certified check, or bidder's bond, payable to the City of San Bernardino in an amount equal to at least ten percent (10%) of the bid as a guarantee that the bidder will enter into the contract if the same is awarded to him, and in the event of failure to enter into such contract said cash, cashier's check, certified check, or bond shall become the property of the City of San Bernardino. If the City of San Bernardino awards the contract to the next lowest bidder, the amount of the lowest bidder's security shall be applied to the difference between the low bid and second lowest bid, and the surplus, if any, shall be returned to the lowest bidder. The Contractor shall be required to post a bond in the amount of 100% of the contract price and a labor and material bond equal to 50% of the contract price. No proposal will be considered from a Contractor who is not licensed as a "B" License or "C4", "C10" & "C36" license contractor, at time of bid, or to whom a proposal form has not been issued by the City of San Bernardino. All questions should be submitted to the Project Manager Carlos Miramontes at Miramontes ca@sbcitv.org on or before Monday, July 25, 2022, at the end of closing business day at 5:30 pm. The successful bidder will be required to enter into a contract satisfactory to the City of San Bernardino. The City of San Bernardino reserves the right to reject any and all bids, or to waive any irregularities in the bids.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents