Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

3356 Peachtree Road Buckhead Residential Tower
New Construction, Infrastructure
Conception
$75,000,000 CJ est. value
Atlanta, GA 30326

First United Methodist Church Mixed-use Development
Demolition, New Construction, Infrastructure, Build-out, Renovation
Design
$50,000,000 CJ est. value
Atlanta, GA 30308

The Proctor
New Construction, Infrastructure - 142,000 SF
Design
$55,000,000 CJ est. value
Atlanta, GA 30318

Unpaved Roads - Phase 1, Braeburn Drive, Hirsh Street
Infrastructure
Bidding
$1,890,079 CJ est. value
Atlanta, GA 30334

Unpaved Roads - Phase 1, Braeburn Drive, Hirsh Street
Infrastructure
Bidding
$1,890,079 CJ est. value
Atlanta, GA 30334

Physical Activities Center Expansion Services
Addition, Demolition, Renovation, Infrastructure - 4,500 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Reindeer Drive Water Main Replacement
Term Contract
Results
Atlanta, GA 30329

Chemical Treatment System Improvements at 34 Schools and Water Line Replacement at Seaborn Lee Elementary School
Infrastructure
Results
$1,381,000 est. value
East Point, GA 30344

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Medlock Shops / Johns Creek
New Construction, Infrastructure - 6,200 SF
Construction
$1,600,000 CJ est. value
Johns Creek, GA 30097

Hotel at Southern Post / Roswell
Demolition, New Construction, Infrastructure - 153,137 SF
Pending Verification
$20,000,000 CJ est. value
Roswell, GA 30075

Expansion of Tech Square, Phase IIIA
Demolition, Infrastructure, Renovation - 119,000 SF
Pending Verification
$40,000,000 CJ est. value
Atlanta, GA 30334

Veterans Park - City of Sandy Springs
Infrastructure
Conception
$4,950,000 CJ est. value
Sandy Springs, GA 30350

Last Updated 01/25/2023 10:37 AM
Project Title

Raw Water Transmission Main Renewal Project

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30334   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $8,910,457 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 24, 2023, the project has not been awarded. A timeline for award has not been established. City of Atlanta - Raw Water Transmission Main Renewal Project A- The Work of this Contract is shown on the Drawings and may consist of all or some of the following: 1. Cleaning and renewal of approximately 2,242 LF of existing 36-inch diameter cast iron pipe that is currently out of service. In order to create access to the pipe interior, six (6) temporary access pits will be excavated and the pipe will be cut open in those locations to allow for the removal and subsequent replacement of the original spool pieces. Upon completion of pipeline cleaning and renewal, the excavations will be backfilled and the ground or pavement restored. 2. Pre-cleaning, post-cleaning and Post-Renewal Closed Circuit Television (CCTV) inspection of the cast iron pipeline to be renewed. 3. Pipeline mechanical work including: interior pipe repair at one (1) location on the 36-inch cast iron pipeline, installation of cathodic protection on the 36-inch ductile iron pipe, the replacement of one (1) blowoff valve on the 36- inch pipeline. 4. Temporary and permanent erosion and sedimentation control on all land disturbance. 5. Extra work (if ordered by the City of Atlanta) may include: Additive Alternate 1, additional pipeline renewal not included in the scope above, pipeline repair, valve replacement, cathodic protection installation, or small diameter pipeline work. 6. All associated miscellaneous work, including site restoration, pavement replacement, debris disposal, and cleanup. B. The Contractor shall furnish and install all labor, materials, equipment and incidentals which are reasonable and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents or not. C. The Contractor shall perform the Work complete, in place and ready for continuous service and shall include repairs, replacements and restoration required as a result of all damages that occur as a result of construction under this Contract.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents