Similar Projects
Pinewood Townhomes
New Construction, Infrastructure
Conception
$66,000,000 CJ est. value
Chattanooga, TN 37421

Alton Park Connector - City of Chattanooga
Infrastructure
Conception
$5,500,000 CJ est. value
Chattanooga, TN 37402

Embassy Suites / Chattanooga
New Construction, Infrastructure - 153,536 SF
Design
$3,000,000 CJ est. value
Chattanooga, TN 37402

The Bend - Mixed-Use District
New Construction, Infrastructure - 192,000 SF
Design
$4,000,000,000 CJ est. value
Chattanooga, TN 37402

ADA sidewalk improvements
Addition, Demolition, Infrastructure
Bidding
$2,000,000 CJ est. value
Chattanooga, TN 37406

RFQ Engineering - Flume
Infrastructure
Bidding
$250,000 CJ est. value
Chattanooga, TN 37402

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

899 Cherokee Condominiums
New Construction, Alteration - 18,466 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Chattanooga, TN 37405

Utility Service for East Ridge Splash Pad
Results
East Ridge, TN

Palisades Road Water Line Replacement
Infrastructure
Results
Signal Mountain, TN 37377

Ridgeview at Northpoint Apartments
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Chattanooga, TN 37415

North River Commerce Center
New Construction, Infrastructure - 800,000 SF
Pending Verification
$102,000,000 CJ est. value
Chattanooga, TN 37415

Main Street Affordable Housing Development
New Construction, Infrastructure - 18,000 SF
Pending Verification
$23,000,000 CJ est. value
Chattanooga, TN 37404

Midtown Pathway - City of Chattanooga
Infrastructure
Conception
$3,000,000 CJ est. value
Chattanooga, TN 37411

AutoZone #5517 / Chattanooga
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Chattanooga, TN 37421

Last Updated 04/11/2023 10:57 AM
Project Title

Modifications to Birchwood Landfill Gas Extraction System Additions

Physical Address View project details and contacts
City, State (County) Harrison, TN 37341   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $805,905 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

MODIFICATIONS TO BIRCHWOOD LANDFILL GAS EXTRACTION SYSTEM ADDITIONS CONTRACT NUMBER S-22-002-201 The scope of work shall consist of two separate operations including but not limited to the following: Area 2 (Closed): Construction of five new vertical gas extraction wells and wellhead installations, abandonment of five existing wells, and installation of HDPE gas, leachate and air piping from abandoned wells to new wells. Area 3 (Active): Construction of 8 new vertical extraction wells and wellhead installations, 2-, 4- 8-, and 10-inch HDPE air, leachate and gas piping and two condensate traps. All bidders must be licensed and shall comply with all requirements of the State of Tennessee Contractor's Licensing Act. The City of Chattanooga is an Equal Opportunity Employer. A. The work covered by this Contract consists of furnishing, delivering, and installing all materials, equipment and products for the Modifications to the Birchwood Landfill - Gas Extraction System Additions, shown on the drawings. The work includes the following major elements: 1. Construction of 5 new vertical gas extraction wells within the closed Area 3 landfill waste footprint, including abandonment of 5 existing wells, new wellhead installations, and installation ofHDPE gas, leachate and air piping from abandoned wells to new wells. 2. Construction of 8 new vertical extraction wells within the active Area 2 landfill waste footprint, including new wellhead installations. 3. Installation of 2-, 4-, 8-, and 10-inch HDPE air, leachate and gas piping including associated 2 condensate traps, tie-ins to gas piping and cut-off valves. 4. As-built survey of pipelines and wells tied to the Tennessee State Plane coordinate system, furnished in paper and electronic format

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents