Similar Projects
Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Soil Rehab and Stabilization of Fabri Form
Post-Bid
North Port, FL

Add Lanes and Reconstruct/ Drainage Improvements
Results
FL

Drainage Improvements at Ed Smith Sports Complex
Results
Sarasota, FL 34237

Grid 205B Drainage Improvements
Results
Less than $513,570 est. value
North Port, FL

Unit Price Contract for Roads, Transit, Trails, Sidewalks and Drainage
Term Contract
Results
Less than $14,091,231 est. value
FL

Post Construction Beach Tilling for South Siesta Key Beach Nourishment Phase Il
Results
Less than $12,000 est. value
FL

Seawall Repairs at Denburn Court, Englewood and Hollywood Boulevard, Sarasota
Results
Less than $50,000 est. value
Englewood, FL 34223

Reinforced Concrete Pipe
Term Contract
Results
Sarasota, FL 34230

Roadway Culvert Replacements
Results
$335,490 est. value
North Port, FL 34286

Misc Concrete and Drainage Repairs
Results
Less than $240,271 est. value

Clean and Reshape Ditches
Results
Less than $196,561 est. value

Cut and Fill at Central County Utilities Office Trailer
Results
Less than $25,000 est. value
Sarasota, FL 34238

Unit Price Contract for Stormwater Pipeline Infrastructure Rehabilitation
Term Contract
Results
Sarasota, FL 34230

Drainage Improvements Phase 1 at Venice Municipal Airport
Results
Venice, FL 34285

Last Updated 07/31/2019 02:14 PM
Project Title

Lido Key, Florida Hurricane and Storm Damage Reduction HSDR Project, Sarasota County, Florida

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34236   (Sarasota County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The proposed project is to nourish approximately 1.6 miles of shoreline on Lido Key using beach compatible material. The primary sand source will be portions of Big Sarasota Pass and ebb shoal, split over three borrow areas (B, C and D). The fill template design includes a berm crest elevation of +4.0 feet North American Vertical Datum 1988 (NAVD88) and a sloped berm section from +4 feet NAVD88 down to +2.0 feet NAVD88 at a slope of 1v:100h. The seaward face of the berm has a slope of 1v:10h. The cut depths at the borrow areas will be to a maximum allowable depth of -13.5 feet NAVD88 with a two-foot disturbance depth. Two rubble mound groins will be constructed at the south end of Lido Key. They will consist of uniform 2-ton armor stones, placed on 12-inch-thick marine mattress foundation mats on geotextile fabric. The northern groin, Groin #1, will be 144 feet in length and the southern groin, Groin #2, will be 279 feet in length (along crest). Both groins have a crest width of 9 feet, at an elevation of +4.0 feet NAVD88. Project work also includes, but is not limited to, beach tilling, construction/vibration control and monitoring, turbidity monitoring, environmental species monitoring, beach fill remediation and incidental related work.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents