Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Main Street Reconstruction - City of Cedar Falls
Infrastructure
Design
$12,025,000 est. value
Cedar Falls, IA 50613

McFarlane Park Septic System Replacement
Infrastructure
Post-Bid
$50,000 CJ est. value
La Porte City, IA 50651

FY 2023 CIP Pipelining Phase IVA3
Infrastructure
Post-Bid
$600,000 CJ est. value
Waterloo, IA 50701

Central Rivers AEA - River Hills Paving Project
Infrastructure
Results
$400,000 est. value
Cedar Falls, IA 50613

Central Rivers AEA - River Hills Paving Project
Infrastructure
Results
$400,000 est. value
Cedar Falls, IA 50613

2019 Peter Melendy Park Renovation Project
Infrastructure
Construction
$224,595 CJ est. value
Cedar Falls, IA 50613

2019 Peter Melendy Park Renovation Project
Infrastructure
Construction
$224,595 CJ est. value
Cedar Falls, IA 50613

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Union at North Crossing
New Construction, Infrastructure
Pending Verification
$68,000,000 CJ est. value
Waterloo, IA 50703

Industrial Park Expansion (Phase I) - 5 - City of Cedar Falls
Alteration
Conception
$6,000,000 est. value
Cedar Falls, IA 50613

Residence Inn by Marriott / Cedar Falls
New Construction, Infrastructure - 21,530 SF
Design
$6,500,000 CJ est. value
Cedar Falls, IA 50613

FY 2022 Sidewalk Repair Program - Zone 2
Infrastructure
Post-Bid
$90,000 est. value
Waterloo, IA

Last Updated 02/14/2024 09:32 AM
Project Title

2022 Seal Coat

Physical Address View project details and contacts
City, State (County) Cedar Falls, IA 50613   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Various locations in Cedar Falls This Project involves seal coating 16 street sections, multiple single lane drives within 3 cemeteries and 1 parking lot, covering 51,040.00 S.Y. Work shall include proper surface preparation and proper placement and compaction of the surface.There will NOT be a pre-bid meeting.For consideration by the City of Cedar Falls City Council at its meeting at 7:00 PM on the 5 th day of July, 2022 or at such later time and place as may be fixed. The work under the proposed contract shall commence within ten (10) calendar days after the date as set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project. All work shall be completed within twenty-five (25) working days. Working days will be accumulated concurrently from the date as set forth in the written Notice to Proceed.Each Form of Proposal shall be accompanied in a separate envelope by a proposal guaranty.The successful Bidder shall furnish to the City a performance bond in an amount equal to one hundred percent (100%) of the contract price, guaranteeing faithful performance of the contract and guaranteeing the completed project against defective workmanship and materials for a period of two (2) years from and after completion and acceptance by the City. The successful Bidder shall also provide a payment bond in an amount equal to one hundred percent (100%) of the contract price guaranteeing payment of all persons supplying labor and material, or both, in the execution of the work provide for in the contract.Contact individuals shall be as follows: Matthew Tolan Cedar Falls Engineering Department 220 Clay Street Cedar Falls, IA 50613 matthew.tolan@cedarfalls.com The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids. . All work shall be completed within twenty-five (25) working days

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents