Similar Projects
Payson Avenue Roadway, Water Main, and Sewer Improvements
Bidding
Quincy, IL 62328

Lead Water Service Replacements
Bidding
IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Fire Hydrants
Post-Bid
Springfield, IL 62701

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

Water Main Improvements and Storm Sewer Conversion Kingston Drive, Jordan Avenue, Iola Avenue and Arlington Drive
Results
Romeoville, IL 60441

Water Main Lining
Bidding
Glendale Heights, IL

2020 Water Leak Survey Program
Post-Bid
Darien, IL 60561

Water Main Lining Rohlwing Road
Results
Itasca, IL 60143

Revise Domestic Water System - Division 01
Bidding
Chicago, IL 60612

Various Valves
Post-Bid
Benton, IL 62812

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

2021 Water Main Improvements & Street Resurfacing
Bidding
Evanston, IL

North RAS Valves Installation
Post-Bid
Danville, IL 61832

Water Main Construction - District 5 (Project 20-605)
Term Contract
Results
Chicago, IL

Last Updated 03/30/2021 03:09 AM
Project Title

Water Infrastructure Improvements 2020 - Division A and B

Physical Address View project details and contacts
City, State (County) Champaign, IL   (Champaign County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: • Division A – All labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to construct and provide surface restoration for a Base Bid of approximately 1,800 lineal feet of 8- inch and 8,000 lineal feet of 6-inch diameter PVC water main, hydrant assemblies, valving, fittings and related appurtenances. An additional approximate cumulative 4,300 lineal feet of 6-inch diameter PVC water main may be awarded through Additive Alternates. • Division B – All labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to remove and replace approximately 1,500 water meters.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents