Similar Projects
Replacement of Fire Station 10 - Gate City Boulevard - 89 - City of Greensboro
New Construction, Infrastructure
Conception
$9,450,000 CJ est. value
Greensboro, NC 27407

Recreation Senior Center - City of High Point
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
High Point, NC 27260

The Resurgent Mixed-Use Development
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Greensboro, NC 27401

Smith Farm Apartments
New Construction, Infrastructure
Design
$109,000,000 CJ est. value
Greensboro, NC 27410

Downtown Greenway Phase 4
Infrastructure
Bidding
$17,300,086 CJ est. value
Greensboro, NC 27401

RFQ Construction Manager at Risk - Airfield Equipment Storage Building
New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
Greensboro, NC 27409

Starbucks / Whitsett - Rebid
New Construction, Infrastructure - 2,485 SF
Post-Bid
$1,200,000 CJ est. value
Whitsett, NC 27377

RFP Construction Manager-at-Risk - New Student Recreation and Wellness Center
New Construction, Infrastructure
Post-Bid
$90,000,000 CJ est. value
Greensboro, NC 27411

Waterview Pump Station Improvements - Forcemain Extension
Infrastructure
Results
$2,767,305 CJ est. value
High Point, NC 27265

Waterview Pump Station Improvements - Forcemain Extension
Infrastructure
Results
$2,767,305 CJ est. value
High Point, NC 27265

Battleground Avenue Self Storage / Greensboro
New Construction, Infrastructure - 90,750 SF
Construction
$8,000,000 CJ est. value
Greensboro, NC 27408

Linder Industrial Machinery
New Construction, Infrastructure - 32,000 SF
Construction
$9,000,000 CJ est. value
Greensboro, NC 27406

Carroll South
New Construction, Infrastructure - 30,000 SF
Pending Verification
$140,000,000 CJ est. value
Greensboro, NC 27401

Wolfetrail Road Multi Residential
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Greensboro, NC 27406

Mackay Road - 158 - City of Greensboro
Infrastructure
Conception
$3,536,680 CJ est. value
Greensboro, NC 27407

Last Updated 07/24/2023 04:24 PM
Project Title

Water Booster Stations - Phase 1

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27401   (Guilford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $8,855,208 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 21, 2023, construction is underway, however, an exact timeline for construction has not been confirmed. The City reserves the right to waive any informality or to reject any or all bids or to award such contract as in its judgment is deemed to be in the best interest of the City. No proposal shall be considered or accepted by the City unless at the time of its filing the same shall be accompanied by a five percent bid security as indicated in the Instructions to Bidders. A separate performance bond and payment bond each in an amount equal to one hundred percent (100%) of the contract price will be required of the Successful Bidder following award of the Contract by the City. Consideration will be given only to proposals submitted by contractors licensed in the state of North Carolina under the Contractor's Licensing Act of 1925 or as amended. The work in this contract consists of construction of a new water booster station (Four Farms Road), demolition of an existing water booster station (Jessup Grove Road), and various process and site improvements at existing water booster stations (Regional Road, McConnell Road and US Highway 70). Provide all labor, materials, tools, equipment and services required to furnish, install, test and place calcium hypochlorite tablet feed systems into operation as shown and as specified herein. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents