Similar Projects
Fire Line Backflow Services
Term Contract
Bidding
FL

Fairways of Capri Isles Water Main Improvements
Bidding
$600,000 est. value
Venice, FL

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Unit Price Contract for Small Pipeline
Term Contract
Post-Bid
Less than $5,000,000 est. value
Sarasota, FL 34230

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)
Results
$12,092,815 est. value
FL

Valve Replacement Program – Phase 13
Results
Less than $125,000 est. value
Venice, FL 34285

Nokomis Sewer Phase II
Post-Bid
FL

Hillview Forcemain Extension and Midnight Pass Watermain Replacement
Results
$375,146 est. value
Sarasota, FL 34230

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Turtle Rock-McIntosh Reclaimed Water Main
Results
$503,593 est. value
Sarasota, FL 34230

Myakkahatchee Creek Water Treatment Plant to Ortiz Water Main
Results
North Port, FL

South Biscayne Drive and Pan American Boulevard Bridge Pipeline Replacements
Results
$538,357 est. value
North Port, FL 34287

Peace River Water Main Interconnect
Results
$17,786,340 est. value
Sarasota, FL 34230

San Mateo Potable Water Main
Results
North Port, FL 34286

Water Distribution System Improvements
Results
Less than $509,389 est. value
North Port, FL

Last Updated 05/15/2020 09:04 AM
Project Title

Bayfront Park AC Water Main Replacement Siesta Drive AC Water Main Replacement 7

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34236   (Sarasota County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes all labor, material, equipment, testing, tax, overhead, and profit necessary to install, construct, and place into service the items described to provide a complete and functional system ready for use by the City. The Contractor to complete the Bayfront Park AC Water Main Replacement firstly, then Siesta Dr. AC Water Main, and lastly the 7th St. AC Water Main respectively. Contractor may start and work on all three projects concurrently, however, substantial and total completion shall be project specific.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents