Similar Projects
Bridge Deck Overlay - I 265
Infrastructure
Conception
$10,921,031 CJ est. value
New Albany, IN 47150

New Albany Police Station / New Albany
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
New Albany, IN 47150

South Monon Freedom Trail - City of New Albany
Infrastructure
Design
$4,100,000 CJ est. value
New Albany, IN 47150

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Beechwood Courts
New Construction, Renovation, Infrastructure
Post-Bid
$15,000,000 CJ est. value
New Albany, IN 47150

Building Demolition and Site Clearance at Riverview Tower
Demolition, Infrastructure
Results
New Albany, IN 47150

SE000A Site - Campus Sidewalks - Central Campus
Infrastructure
Results
$309,400 CJ est. value
Bloomington, IN 47405

Local Road Paving Project 2022 and Spot Patching Road Project 2022
Infrastructure
Construction
$1,198,293 CJ est. value
New Albany, IN 47150

64 Innovation Corridor Project - County of Floyd
Infrastructure
Pending Verification
$4,200,000 CJ est. value
Georgetown, IN 47122

Southern Indiana Youth Sports Complex - County of Floyd
New Construction, Infrastructure
Pending Verification
$700,000 CJ est. value
New Albany, IN 47150

Bike / Pedestrian Facilities - ST 1015
Infrastructure
Design
$1,867,134 CJ est. value
New Albany, IN 47150

Building Demolition and Site Clearance at Beechwood Court
Demolition, Infrastructure
Post-Bid
$26,150,000 est. value
New Albany, IN 47150

Community Crossing Road Paving Projects 2023
Infrastructure
Results
$1,353,600 CJ est. value
New Albany, IN 47150

Take 5 Carwash / New Albany
New Construction, Infrastructure - 3,231 SF
Post-Bid
$733,437 CJ est. value
New Albany, IN 47150

Take 5 Oil Change / New Albany
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
New Albany, IN 47150

Last Updated 04/28/2023 07:31 PM
Project Title

Altawood and Buffalo Trail Sanitary Sewer Improvements Projects

Physical Address View project details and contacts
City, State (County) New Albany, IN 47150   (Floyd County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $734,306 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 28, 2023, project was awarded to Lyles Construction awarded amount is $734,306.18. Should any citizens require special provisions, such as handicapped modifications or non-English translation personnel, the County will provide such provisions as long as the request is made by February 20, 2023. The project generally consists of the following: Installation of approximately 7,000 LF of 4", 3", and 2" small diameter pressure sewer lines and associated lateral connections for the installation of a low pressure sewer system. Questions pertaining to the plans and specifications shall be directed to Mr. Bob Woosley, P.E. via email at bwoosley@heritageeng.com or (812) 280-8201 The work to be performed and the bid to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. Each bid must be enclosed in a sealed envelope bearing the title of the Project and the name and address of Bidder. All bids must be submitted on the bid forms as identified in the Contract Documents. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and supplying of materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. A conditional or qualified Bid will not be accepted. Award will be made to the lowest, responsive, responsible bidder. The lowest, responsive, responsible bidder must not be debarred, suspended, or otherwise be excluded from or ineligible for participation in federally assisted programs under Executive Order 12549. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the project throughout. Bids shall be properly and completely executed on bid forms included in the Specifications. Bids shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement (i.e. Indiana Form 96A or equivalent). The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Plans and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid. Bidders on this work shall be required to comply with the provisions of the President's Executive Order No. 11246, as amended. The Bidders shall also comply with the requirements of 41 CFR Part 60 - 4 entitled Construction Contractors - Affirmative Action Requirements. A copy of 41 CFR Part 60 - 4 may be found in the Specifications. American Iron and Steel requirements will apply to this project. FLOYD COUNTY BOARD OF COMMISSIONERS, FLOYD COUNTY, INDIANA hspaxlp

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents