Similar Projects
SR-204; Dual Left NB at US-89 Other - Traffic Management and ITS Projects
Bidding
$500,000 est. value
UT

Traffic Signal Synchronization Upgrades
Post-Bid
Less than $250,000 est. value
Salt Lake City, UT 84114

Astro Brackets
Post-Bid

14600 South / Redwood Road Traffic Signal
Results
Bluffdale, UT 84065

2019 Traffic Improvements Project
Results
$260,000 to $290,000 est. value
Orem, UT 84057

NEMA TS-2 Traffic Signal Controllers
Post-Bid
Taylorsville, UT 84129

SR-315; North Marina to US-89
Results
$500,000 to $1,500,000 est. value
UT

Traffic Signal Underground Service Pedestals
Term Contract
Post-Bid

Salt Lake County Area Signal Detection Upgrade Detection
Results
Less than $500,000 est. value
UT

2020 Cascade Hawk Signal Project
Post-Bid
$59,500 to $65,750 est. value
Orem, UT 84097

2020 Pedestrian Crosswalk 1200 South 500 East
Results
Heber City, UT 84032

Traffic Signal Upgrades 2017/2018
Term Contract
Post-Bid
Less than $250,000 est. value
Salt Lake City, UT 84111

2550 South (Ogden) Crossing Improvements Railway-Highway Grade Crossing/Railroad Safety
Results
Less than $500,000 est. value
UT

Eagle Mountain Boulevard Traffic Signal at Aviator Avenue
Post-Bid
Eagle Mountain, UT

Washington Parkway and Telegraph Street Signal Project
Results
Washington, UT 84780

Last Updated 12/27/2019 02:58 PM
Project Title

1400 West Snow Canyon Parkway Traffic Signal

Physical Address View project details and contacts
City, State (County) Saint George, UT 84770   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $237,914
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new traffic signal at the intersection of 1400 West and Snow Canyon Parkway. Other miscellaneous improvements include minor curb and gutter reconstruction, pedestrian access ramps, island reconstruction, paint striping removal and new paint striping. Also includes reconstruction of concrete islands located on Mall Drive and intersection improvements at Tabernacle and 700 East.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents