Similar Projects
Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Washington County Concrete Drainage Features
Post-Bid
Chipley, FL 32428

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Construction Services for Poitras East Community Development District
Post-Bid
FL

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Kaicasa - Concrete Box Culvert
Post-Bid
Immokalee, FL

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

10/1366DN EGLIN NON-POINT SOURCE PROJECT OKALOOSA / W
Post-Bid
Eglin AFB, FL

Seawall Repair
Results
Everglades, FL

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

Last Updated 04/22/2020 01:33 AM
Project Title

Seawall Joint and Paver Repair Work - Live Oak Point

Physical Address View project details and contacts
City, State (County) Port Charlotte, FL 33980   (Charlotte County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Professional, licensed individual or firm for services required for the seawall joint and paver repairs at Live Oak Point, located at 5100 Tamiami Trail, Charlotte Harbor, Florida 33980.The Scope of Services shall include, but not be limited to, the following: Remove and stockpile pavers and bedding sand. Preserve and pull back existing geotextile fabric. Excavate behind seawall and stockpile removed material. Install geotextile fabric from bottom of cap to six (6”) inches below mudline. Place and compact fill material. Restore existing geotextile fabric. Replace missing or damaged fabric. Reset Pavers and compact in place with joint sand. Reset electrical vaults and conduit disturbed during excavation. Electrical services shall be shut off by Contractor prior to excavation and restored once complete. Form and pour concrete in a manner to prevent concrete from dropping through water column. Concrete work shall be done in accordance with the concrete notes listed on the engineered drawings. Fill gap between seawalls with #89 stone.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents