Similar Projects
Construction of the Town of St. Joe - 2022 -Roadway Preventative Maintenance Project
Infrastructure
Bidding
Saint Joe, IN 46785

2022 Road Resurfacing Projects
Infrastructure
Bidding
Auburn, IN

Brightmark Energy/RESPolyflow Utilities Extension
Infrastructure
Post-Bid
Ashley, IN

Infrastructure Expansion Project B
Results
Ashley, IN 46705

Auburn-Waterloo Bikeway
Results
Waterloo, IN 46973

Intersection Improvement and Traffic Signals
Results

IDIQ Pavement Patching
Results

Hunters Glen Subdivision Milling and Resurfacing
Results
Less than $240,000 est. value
Auburn, IN 46706

South Grandstaff Drive Milling and Resurfacing
Results
Less than $500,000 est. value
Auburn, IN 46706

Road Resurfacing
Results
Auburn, IN

Waterloo 2021 CCMG - North Commerce Drive and County Road 27
Infrastructure
Results
$351,758 est. value
Waterloo, IN

Greenhaven Terrace Reconstruction
Infrastructure
Results
Auburn, IN 46706

Woodcrest Addition Street Reconstruction
Infrastructure
Results
$569,433 est. value
Auburn, IN 46706

Road Extension to Handshoe Property
Infrastructure
Results
Less than $500,000 est. value
Garrett, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Last Updated 02/04/2022 09:00 AM
Project Title

Union Street Reconstruction

Physical Address View project details and contacts
City, State (County) Auburn, IN   (De Kalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of total reconstruction of approximately 1458 linear feet of street pavement at varying widths from 12 feet to 34 feet for a total of 4,860 square yards, with pavement section to be 5-1/2 inches of asphalt on 12 inches of limestone base or 4 inches of asphalt on 10 inches of limestone, including placement of approximately 2,450 linear feet of 4 inch perforated flex under-drain pipe. Also including removal and replacement of the following: approximately 653 square yards of concrete sidewalk, 100 square yards of concrete ADA ramp, 2300 linear feet of concrete curb and gutter, 430 square yards of concrete street and driveway approach, and all grass restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents