Similar Projects
FY21 Dock Repair - Apostle Islands National Lakeshore
Design
$500,000 to $1,000,000 est. value
Bayfield, WI

Z--35234 - St. Croix Shores Boathouse - Stairs Project
Design
$500,000 to $1,000,000 est. value
Saint Croix Falls, WI 54024

Boat Launch Improvements
Bidding
$475,000 est. value
Fountain City, WI 54629

J--Dock Repair
Post-Bid
$250,000 to $500,000 est. value
Bayfield, WI

126' Aluminum Truss Dock
Post-Bid
Scandinavia, WI 54977

Boat Launch Repair
Results
Less than $360,000 est. value
Madison, WI 53703

Cotton Mill Park Fishing Platforms and Kayak Launch
Addition
Results
Beaver Dam, WI 53916

Seasonal Removal and Installation of Dock
Post-Bid
De Soto, WI 54624

Courtesy Dock and Ramp
Results
Prescott, WI 54021

Pewaukee Lake Boat Launch Reconstruction
Post-Bid
Pewaukee, WI 53072

Instrumentation for Prestressing Miter Gate Diagonals - Lock & Dam 4
Results
Alma, WI 54610

Fountain City Service Base Phase II Design Build
Post-Bid
Fountain City, WI

Pine Lake Boat Launch Access Improvements
Results
Chenequa, WI

Boat Landing Improvements
Post-Bid
Wauzeka, WI

Pier 1 Water and Decking
Results
Washburn, WI 54891

Last Updated 01/13/2021 11:00 PM
Project Title

Columbus - Watertown, Beaver Dam River

Physical Address View project details and contacts
City, State (County) WI   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.122 Miles; Base, Asphaltic Surface, Curb and Gutter, Beam Guard, Pavement Marking, and Bridge Deck Replacement. Backfill Structure, 214 Ton; Base Aggregate Dense, 174 Ton; Select Crushed Material, 60 Ton; Concrete Pavement, 218 SY; Concrete Masonry Bridges, 259 CY; Bar Steel Reinforcement, 2,200 Lbs; Bar Steel Reinforcement Coated, 56,720 Lbs; Marking Epoxy, 2,050 LF; Construction Staking, 1,040 LF; Construction Staking, 2 LS; Concrete Curb and Gutter, 58 LF; Beam Guard, 200 LF; Beam Guard Energy Absorbing Terminals, 4 Each; Asphaltic Surface, 238 Ton; Removing Asphaltic Surface Milling, 2,006 SY; Tack Coat, 121 Gals.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents