Similar Projects
Argentine Street Commercial Building
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Georgetown, CO 80444

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Eisenhower/Johnson Memorial Tunnel (EJMT) Consolidation Grouting and Structural Repair Project
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Georgetown, CO 80444

Eisenhower/Johnson Memorial Tunnel (EJMT) Consolidation Grouting and Structural Repair Project
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Georgetown, CO 80444

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

On Call Region 1 Asphal Paving Services
Results

Mighty Argo - Argo Landing
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Idaho Springs, CO 80452

John Tomay Library Reconstruction
Addition, Demolition, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, CO 80444

Public Works Facility
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Idaho Springs, CO 80452

Roadway Crack Sealing Project
Infrastructure
Results
Less than $45,000 est. value
Dumont, CO

Circle K Stores / Georgetown
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Georgetown, CO 80444

Region 3 PS I-70 West Vail Pass Auxiliary Lanes - Colorado Department of Transportation
Term Contract
Post-Bid
$170,000,000 CJ est. value
Georgetown, CO 80444

Frost Heave Repair - Witter Gulch Road
Infrastructure
Results
Dumont, CO

Griffith Twelve
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Georgetown, CO 80444

CCSD-2022 Sanitary Sewer Manhole Rehabilitation Project
Infrastructure
Post-Bid
$340,000 CJ est. value
Idaho Springs, CO 80452

Last Updated 03/08/2023 03:31 AM
Project Title

Mizpah Campground Aquatic Organism Passage

Physical Address View project details and contacts
City, State (County) Empire, CO 80452   (Clear Creek County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $595,863 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Mar 03, 2023 Contract Award Number: 1240LT23C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: V4GVJZF4S263 Contractor Awarded Name: Nakupuna Solutions, LLC Contractor Awarded Address: Arlington, VA 22202-3410 USA Base and All Options Value (Total Contract Value): $595,863.00 Arapaho and Roosevelt National Forests and Pawnee National Grasslands Project Name: Mizpah Campground Aquatic Organic Passage Project Location: Mizpah Campground is located approximately 6 miles west of Empire, Colorado, along US-40. The project location is located on NFSR 250, approximately 360 feet south of US-40.. Period of Performance: 03/01/2023 to 11/30/2023 Between $500,000 and $1,000,000. The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK: The work for this contract includes all labor, materials, supplies, and equipment for the installation of an AOP, to include but not limited to: - Design, Excavate and Construct the footings. - Install traffic control signs and close National Forest System Road 250. - Install the stream-flow diversion system. - Construct the channel bed and banks within the structure. - Supply and install the precast box culvert. - Remove stream-flow diversion system and return flow to the channel. - Install structural backfill and embankment. - Place surface aggregate. - Install object markers. - Remove signs and re-open National Forest System Road 250. - Seeding, planting, and final site work. - Fell and place dead trees on upstream floodplain In addition to the installation of the AOP, a requirement of this contract is to provide a design for the structure footings for review that is coordinate with the structure supplier and approved by an engineer licensed in Colorado. All available information for this task is provided in this contract.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents