Last Updated | 03/08/2023 03:31 AM |
Project Title | Mizpah Campground Aquatic Organism Passage |
Physical Address | View project details and contacts |
City, State (County) | Empire, CO 80452 (Clear Creek County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $595,863 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract Award Date: Mar 03, 2023 Contract Award Number: 1240LT23C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: V4GVJZF4S263 Contractor Awarded Name: Nakupuna Solutions, LLC Contractor Awarded Address: Arlington, VA 22202-3410 USA Base and All Options Value (Total Contract Value): $595,863.00 Arapaho and Roosevelt National Forests and Pawnee National Grasslands Project Name: Mizpah Campground Aquatic Organic Passage Project Location: Mizpah Campground is located approximately 6 miles west of Empire, Colorado, along US-40. The project location is located on NFSR 250, approximately 360 feet south of US-40.. Period of Performance: 03/01/2023 to 11/30/2023 Between $500,000 and $1,000,000. The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK: The work for this contract includes all labor, materials, supplies, and equipment for the installation of an AOP, to include but not limited to: - Design, Excavate and Construct the footings. - Install traffic control signs and close National Forest System Road 250. - Install the stream-flow diversion system. - Construct the channel bed and banks within the structure. - Supply and install the precast box culvert. - Remove stream-flow diversion system and return flow to the channel. - Install structural backfill and embankment. - Place surface aggregate. - Install object markers. - Remove signs and re-open National Forest System Road 250. - Seeding, planting, and final site work. - Fell and place dead trees on upstream floodplain In addition to the installation of the AOP, a requirement of this contract is to provide a design for the structure footings for review that is coordinate with the structure supplier and approved by an engineer licensed in Colorado. All available information for this task is provided in this contract. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |