Similar Projects
Demolition B-3742 MCAS
Demolition
Design
$1,000,000 to $1,500,000 est. value
Cherry Point, NC

Former Police HQ Building - Hazardous Materials Abatement
Renovation - 57,120 SF
Post-Bid
Raleigh, NC 27601

Contaminated Soil Disposal Services
Post-Bid
Charlotte, NC 28206

Scott and Walker Residence Hall Demolition
Demolition
Results
Cullowhee, NC

Demolish and Remove a Dilapidated Commercial Building
Demolition
Results
Bladenboro, NC 28320

Lot Cleaning, Asbestos Abatement and Demolition 9/23/20
Post-Bid
Fayetteville, NC

Demolition of the Old Dixon Middle School
Demolition
Results
Holly Ridge, NC 28445

Public Safety Building Demolition Package
Demolition
Post-Bid
Atlantic Beach, NC

Mocksville Readiness Center Indoor Firing Range Lead Remediation
Results
Mocksville, NC 27028

Lot Cleaning, Asbestos Abatement and Demolition
Demolition
Post-Bid
Fayetteville, NC

Residential Demolition Contractors
Demolition
Results
Less than $33,500 est. value
New Bern, NC 28561

Site Clean UPS
Post-Bid
Durham, NC 27701

High Point Readiness Center Indoor Firing Range Lead Remediation
Results
High Point, NC 27260

Demolition And Asbestos Removal
Demolition
Post-Bid
Kinston, NC 28501

Williamston Readiness Center Indoor Firing Range Lead Remediation
Results
Williamston, NC 27892

Last Updated 12/22/2021 09:54 AM
Project Title

Edenton Readiness Center Indoor Firing Range Lead Remediation

Physical Address View project details and contacts
City, State (County) Edenton, NC 27932   (Chowan County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Demolition, Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the cleaning, demolition, and remediation of the existing indoor firing range into general storage space. This project includes lead cleaning, removal of all associated backstops, deflectors, and other associated firing range items. The existing walls shall be epoxy painted, existing deck and structure shall be painted, existing pit infilled with concrete, and the existing concrete slab shall have a resinous flooring system installed. Project also includes minimal mechanical and electrical work associated with the lead cleaning and remediation. No alterations are being made to life safety, occupant load, or path of egress.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Demolition, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents