Similar Projects
The Davis Community
New Construction - 211,475 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28411

Hayes Barton Place
New Construction
Conception
Raleigh, NC

Senior Continuing Care Retirement Community
New Construction
Design
Cherokee, NC

Midtown Exchange
New Construction - 946,500 SF
Design
$1,000,000,000 est. value
Raleigh, NC 27609

Windsor Run New Building
New Construction
Post-Bid
Matthews, NC 28105

1603 And 1593 Monroe Police Station Monroe Senior Center
New Construction, Renovation - 59,596 SF
Results
Monroe, NC 28112

The Terraces
New Construction, Addition
Construction
Charlotte, NC 28210

Trinity Landing Phase I & Phase II
New Construction - 398,219 SF
Construction
$94,000,000 est. value
Wilmington, NC 28409

Heritage Hills Expansion
New Construction - 18,655 SF
Pending Verification
Hendersonville, NC 28791

Senior Living Community
New Construction
Pending Verification
Raleigh, NC 27606

Caroline
New Construction - 95,000 SF
Conception
Cornelius, NC 28078

Deerfield Phase III
New Construction
Design
Asheville, NC 28803

The Crossings at Brookberry
New Construction - 152,350 SF
Construction
$10,000,000 CJ est. value
Winston-Salem, NC 27106

Crabtree Village Senior Living
New Construction - 202,486 SF
Conception
$10,000,000 CJ est. value
Raleigh, NC 27612

The Landings of Flat Rock
New Construction - 32,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Flat Rock, NC 28731

Last Updated 04/12/2022 03:47 PM
Project Title

Arbor Acres East and West

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27104   (Forsyth County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status Construction Commenced August 2021, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Frank L. Blum Construction Company is bidding the final permit drawings for the Arbor Acres new Independent Living Apartment buildings. The buildings consist of multi-story concrete & structural steel construction and contain 56 apartment units on top of a concrete and steel metal deck parking deck. Both buildings have common terraces with a shared courtyard with a single level connector connecting the two buildings. The project is expected to start in Q2 2021. The scope of work includes shallow foundations, cast in place, slab on grade and elevated slab on deck concrete with precast balconies, masonry elevator and stair shafts, structural steel framing, metal framing & trusses, wood framing exterior walls, metal framing/drywall, carpet, hardwood floors, hard tile, running trim, residential cabinets/countertops, fiber cement siding, EIFS/Stucco siding, metal panel siding, Shingle, TPO, Metal roofing and aluminum gutters/downspouts. The MEP scope of work consists of a fire sprinkler system to meet the NFPA 13 standard, new apartment unit bathrooms and kitchens, new electrical service and backup generator with new services for every apartment, and new HVAC services

Details

171,265 SF - 1 Assisted Living Facility, 4 Stories Above Grade, 94,967 SF New Construction, 1 Assisted Living Facility, 3 Stories Above Grade, 76,298 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents