Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Fire Station 41 Reconstruction - PB1823 - City Of Overland Park
Demolition, New Construction, Infrastructure
Conception
$13,000,000 CJ est. value
Overland Park, KS 66204

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

Veterans Park Memorial and Fishing Jetties
Infrastructure
Bidding
$1,000,000 CJ est. value
Spring Hill, KS 66083

Veterans Park Memorial and Fishing Jetties
Infrastructure
Bidding
$1,000,000 CJ est. value
Spring Hill, KS 66083

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

2021 Street Maintenance Program
Infrastructure
Post-Bid
Edgerton, KS

Road Construction, Moonlight Road
Results
KS

Road Construction, East of Mission Road
Results
KS

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

Stoneridge Second Plat - Lenexa
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Lenexa, KS 66227

Last Updated 11/02/2022 03:31 PM
Project Title

119th Street Woodland To Northgate Improvements - 3-C-024-XX - City Of Olathe

Physical Address View project details and contacts
City, State (County) Olathe, KS 66062   (Johnson County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct 119th Street as a 4-lane divided arterial between Woodland Road and Nelson Road. This project is included in the city's FY 2022-2026 Capital Improvement Program. As of November 2, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The contact(s) will not accept phone call inquiries at this time.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents