Similar Projects
N--Fiber Upgrade for WHS
Term Contract
Bidding
Albuquerque, Fort Wingate, NM 87316

Furnish and Install Fiber Optic Cable and Materials
Term Contract
Post-Bid
Aztec, NM 87410

A Dedicated Service at 100 MB from (Bldg) 801; Room: Manhole, 801 University Blvd; Albuquerque, NM, 87109, Us To Bldg 20449, Room 100, 2051 Wyoming Blvd Southeast, Kirtland AFB, NM 87117.
Post-Bid
Albuquerque, NM 87109

Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Results
$700,000,000 est. value

Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP)
Results
$700,000,000 est. value

Submit A Quote To Provide, Install, And Maintain A 10Gb (Gigabit Ethernet) Commercial Lease Between Bldg 123, Rm 102, 123 Crozier Street, White Sands Missile Range, NM , and Bldg 20449; Rm 100A, 2051 Wyoming Blvd; Kirtland AFB, NM.
Post-Bid
Albuquerque, Kirtland, NM 87123

National Physical Security (NPSP) Maintenance and Installation
Results
Less than $29,000,000 est. value

Enterprise Network Access Control
Post-Bid
Albuquerque, NM 87131

Commercial Ethernet Gateway (CEG) - Continental United States (CONUS) Region One
Results

Wide Area Network
Post-Bid
Washington, DC

Badge Control System
Results
Albuquerque, NM 87117

N--PETR Security Camera Install Project
Post-Bid
Albuquerque, NM 87120

Surveillance Camera System
Results
Farmington, NM 87401

Enterprise Cabling On Demand
Term Contract
Post-Bid
Albuquerque, NM 87125

Construction of Aztec High School Security Improvements
Results
Aztec, NM 87410

Reported 08/21/2021 12:00 AM
Project Title

UFR Airfield Camera

Physical Address View project details and contacts
City, State (County) Albuquerque, Kirtland, NM 87151 (Bernalillo, San Juan Counties)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Airfield Management (AM) requires a camera system to monitor ramps, runways and taxiways. System requires four cameras which need to be individually controlled, meaning AM personnel can point and focus the camera on specific items on the airfield. Computer system and recording device must be compatible and enable loop type recordings. Cameras must be able to view and focus long range items. Camera mounts must be installed using industry standard components and installed in such a manner as to provide a 360 degree view around the facility. Mounts should be able to withstand high wind events (60+ mph). All wiring shall be secured via industry standard methods and/or within conduit as required by code, existing laws or other mandatory standards. Wiring should be weatherproof where exposed to the elements. Contractor shall supply all needed items to complete the work. This will include lifts, tools, supplies, equipment, etc. Airfield Management Operations will be supplied with a computer and the required software to view and operate the tilt/pan/zoom functions on the cameras, as well as copies of all manuals.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents