Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

On-Call Paving
Term Contract
Post-Bid
Norfolk, VA

Virginia Beach Boulevard Improvements at Newtown Road
Results
Norfolk, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Miscellaneous Small Site and Roadway Projects - FY20 - Indefinite Quantity Contract
Results
Norfolk, VA 23510

Soil Densification and Pavement Lifting FY20
Results
Norfolk, VA 23510

NTC Bus Parking Lots Repairs
Results
$493,305 est. value
Norfolk, VA 23502

East Little Creek Road and Admiral Taussig Boulevard Intersection Improvements
Results
$603,998 est. value
Norfolk, VA 23510

Maycox Avenue Roadway Improvements
Results
Less than $409,761 est. value
Norfolk, VA 23510

Water Activated Cold Patch
Term Contract
Results

I-64 Express Lanes - Segment 2
Results
Less than $22,000,000 est. value

Resurfacing Program FY 21 IDQ
Results
Norfolk, VA 23510

Granby Street Bike Bypass at Riverview
Results
Norfolk, VA

Wood Street Roadway and Utility Improvements
Results
Norfolk, VA

2021 Plant Mix
Results
Less than $2,400,000 est. value

Last Updated 04/20/2020 10:26 AM
Project Title

Lake Taylor High School Bus Loop and Storm Drainage Project

Physical Address View project details and contacts
City, State (County) Norfolk, VA   (Norfolk City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $465,451
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the removal of the existing storm piping, curb inlets and the existing monolithic curb, gutter and approximately one-half of the concrete school bus loop drive aisle. New curb inlets, storm piping, concrete curb and gutter as well as a flexible bituminous school bus loop drive aisle will be constructed. The existing storm piping will be removed in conjunction with the installation of new storm piping.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents