Similar Projects
Last Updated | 03/27/2021 03:10 AM |
Project Title | Road Resurfacing on SR 188 |
Physical Address | View project details and contacts |
City, State (County) | TN 38001 (Crockett County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project No. HSIP-188(11), 17009-4202-04 (PIN 127385.00), 17009-3202-94 (PIN 127385.00), 17009-4204-04 (PIN 127385.00) The resurfacing on S.R. 188 from S.R. 54 (L.M. 0.00) to Colvett Road (L.M. 4.73), including bridge repair. Project Length - 4.730 miles Project No. HSIP-188(12), 17010-4217-04 (PIN 127386.00), 17010-4216-04 (PIN 127386.00), 17010-3217-94 (PIN 127386.00) The full depth reclamation and paving on S.R. 188 from Colvett Road (L.M. 4.73) to the Gibson County line (L.M. 12.03), including bridge repair. Project Length - 7.300 miles 202-03.01 Removal Of Asphalt Pavement 1,335.000 s.y. 203-06 Water 338.000 m.g. 208-01.05 Brooming & Degrassing Shoulders 9.460 l.m. 303-02 Mineral Aggregate, Type b Base, Grading (Description) (d) 3,066.000 Ton 304-01.04 Processing (Reclaimed Base Material) 107,066.000 s.y. 304-01.08 Portland Cement (Full Depth Pavement Reclamation) 3,212.000 Ton 307-01.01 Asphalt Concrete Mix (Pg64-22) (Bpmb-Hm) Grading a 461.000 Ton 307-01.08 Asphalt Concrete Mix (Pg64-22) (Bpmb-Hm) Grading b-m2 151.000 Ton 403-01 Bituminous Material For Tack Coat (Tc) 73.000 Ton 405-01.01 Bituminous Material (Bsc) 125.000 Ton 405-01.02 Mineral Aggregate (Bsc) 1,184.000 Ton 411-01.10 Acs Mix(Pg64-22) Grading d 15,254.000 Ton 411-12.04 Scoring For Rumble Stripe (Noncontinuous) (4in Width) 10.987 l.m. 415-01.01 Cold Planing Bituminous Pavement 7,592.000 Ton 705-02.10 Guardrail Transition 27in To 31in 12.000 Each 705-04.09 Earth Pad For Type 38 Gr End Treatment 8.000 Each 705-06.20 Tangent Energy Absorbing Term Mash Tl-3 20.000 Each 705-06.25 Thrie Beam Bridge Transition Mash Tl-3 8.000 Each 705-10.33 Guardrail Attachment To Concrete Bridgerail 126.000 l.f. 712-01 Traffic Control (1) Ls 712-06 Signs (Construction) 2,210.000 s.f. 713-16.01 Changeable Message Sign Unit 4.000 Each 716-01.21 Snowplowable Raised Pavement Markers (Bi-Dir) (1 Color) 478.000 Each 716-02.04 Plastic Pavement Marking(Channelization Striping) 264.000 s.y. 716-02.05 Plastic Pavement Marking (Stop Line) 192.000 l.f. 716-02.06 Plastic Pavement Marking (Turn Lane Arrow) 2.000 Each 716-03.03 Plastic Word Pavement Marking (Stop Ahead) 5.000 Each 716-05.20 Painted Pavement Marking (6" Line) 42.773 l.m. 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 42.773 l.m. 716-12.04 Enhanced Flatline Thermo Pvmt Mrkng (4in Dotted Line) 70.000 l.f. 716-12.05 Enhanced Flatline Thermo Pvmt Mrkng (6in Dotted Line) 70.000 l.f. 716-12.06 Enhanced Flat Line Thermo (8in Line) 313.000 l.f. 717-01 Mobilization (1) Ls 617-04.01 Type 1 Thin Epoxy Overlay (Epoxy-Urethane) 3,261.000 s.y. 712-04.01 Flexible Drums (Channelizing) 6.000 Each 712-05.01 Warning Lights (Type a) 10.000 Each 712-06 Signs (Construction) 377.000 s.f. 712-07.03 Temporary Barricades (Type Iii) 48.000 l.f. 716-02.05 Plastic Pavement Marking (Stop Line) 24.000 l.f. 716-05.01 Painted Pavement Marking (4" Line) 29.600 l.m. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |