Similar Projects
4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main and Sidewalk Improvements - CDBG
Results
Clermont, FL

Trowell Avenue Stormwater Baffle Box Project
Results
Less than $150,000 est. value
Umatilla, FL

Palatlakaha River Villa City Water Control Structures Replacement
Results
Tavares, FL

Water Main and Meter Replacement
Results
$1,250,000 est. value
Yalaha, FL 34797

Wastewater Interconnect with City of Eustis
Results
Less than $5,500,000 est. value
Umatilla, FL 32784

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Intent to Utilize Seminole County Contract for Hydrant and Valve Services
Term Contract
Results
Clermont, FL

Woodward Avenue Road and Utility Improvements
Results
Less than $500,000 est. value
Eustis, FL 32726

6815 CR 48 Reuse Extension - Spring Creek
Results
$110,000 to $140,000 est. value
Leesburg, FL

Cottonwood Fire Protection Improvement
Results
$528,175 est. value
Leesburg, FL 34748

Hickory Head Valves and Actuators
Infrastructure
Results
The Villages, FL 32159

Lake Joanna Water Quality Improvements
Infrastructure
Results
$180,075 est. value
Tavares, FL

Installation of 6-Inch Pipeline at the Nutrient Reduction Facility
Infrastructure
Results
Mount Dora, FL 32757

Pneumatic Piping Installation
Infrastructure
Results
Tavares, FL

Reported 03/05/2022 12:00 AM
Project Title

Minneola Turnpike Utility Modifications

Physical Address View project details and contacts
City, State (County) Minneola, FL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing, delivering and installing all materials, equipment and services, including labor, for the Work, which generally forcemain, reuse, and water main utility modifications in the FDOT right-of-way due to the Turnpike roadway widening operations and all associated appurtenances described in the attached contract documents within the FDOT rights of way, and/or any applicable easements.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents