Similar Projects
Tractor Supply
New Construction - 22,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Akron, OH 44310

Cuyahoga Falls Avenue Subdivision
New Construction
Conception
Akron, OH

Restaurants
New Construction - 5,040 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Macedonia, OH 44056

Five Guys
New Construction
Design
Macedonia, OH 44056

Open Market Job Order Contracting Services in the State of Ohio
New Construction, Term Contract
Post-Bid

Set Aside Job Order Contracting Services in the State of Ohio
New Construction, Term Contract
Post-Bid

Sam's Club #6404-605 - CAPX-COMBO
Renovation
Results
Fairlawn, OH 44313

Bus Garage Demolition
Demolition
Results
Less than $143,731 est. value
Uniontown, OH 44685

Blue Habanero
New Construction - 5,150 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Twinsburg, OH 44087

Office and Warehouse Spec Building
New Construction - 42,071 SF
Construction
$3,700,000 est. value
Hudson, OH 44236

Chapel Hill Mall Redevelopment
Renovation - 860,000 SF
Pending Verification
Akron, OH 44310

Tynes Farm Luxury Lifestyle Community
New Construction - 244,800 SF
Pending Verification
Hudson, OH 44236

Mindale Farms Residential Development
New Construction
Conception
Tallmadge, OH 44278

Residences at Good Park
New Construction
Design
$19,450,000 est. value
Akron, OH 44313

Purchase and Development of Various City of Akron Owned Properties in Turner - Lods
New Construction
Post-Bid
Akron, OH

Last Updated 04/08/2022 08:54 AM
Project Title

The Rock Luxury Living - Phase I-III - Master Plan

Physical Address View project details and contacts
City, State (County) Copley, OH   (Summit County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Bank, Food/Beverage Service, Multi-Family Homes, Office, Parking Garage, Retail, Single-Family Homes
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

263,550 SF - Retail, 62,650 SF New Construction, Office, 97,450 SF New Construction, Bank, New Construction, Multi-Family Homes, 7 Stories Above Grade, 97,450 SF New Construction, 80 Unit(s), 11.82 Acres, Multi-Family Homes, New Construction, 76 Unit(s), 28 Single-Family Homes, New Construction, 21.25 Acres, 3 Parking Garage, 3 Stories Above Grade, New Construction, 102 Parking Spaces, 19 Single-Family Homes, New Construction, Food/Beverage Service, 6,000 SF New Construction, 40, New Construction, 1239 Parking Spaces.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Special Function Hardware, Glazing, Special Function Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Security Mirrors and Domes.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Specialty Casework, Bank Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents