Similar Projects
SIMMS - Multimodal Transportation Center - SP1002 - City of Carbondale
New Construction, Infrastructure
Conception
$8,541,000 CJ est. value
Carbondale, IL 62901

Cherry Street/Elm Street Storm Sewer Interceptor Replacement - SS1002- City of Carbondale
Infrastructure
Conception
$675,000 CJ est. value
Carbondale, IL 62901

Southern Illinois University Carbondale - Communications Building Renovations & Additions
Addition, Demolition, Build-out, Infrastructure - 289,050 SF
Design
$84,000,000 CJ est. value
Carbondale, IL 62901

Kayak Launch at Cedar Lake
Infrastructure
Bidding
$65,000 CJ est. value
Carbondale, IL 62901

Various Water Main Replacements
Infrastructure
Bidding
$4,000,000 CJ est. value
Carbondale, IL 62901

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Future Lane Improvements
Infrastructure
Results
$253,041 est. value
Murphysboro, IL 62966

HMA Surface Removal, Resurfacing and Patching on Old IL13
Infrastructure
Results
$2,000,000 est. value
Marion, IL 62959

Feeder Watermain Replacements (Chautauqua - Oakland to Water Tower - 2,300 feet) -WS1302 - City of Carbondale
Infrastructure
Conception
$460,000 CJ est. value
Carbondale, IL 62901

Resurfacing North Marion Street from East Fischer Street to Dillinger Road
Infrastructure
Bidding
$350,000 CJ est. value
Carbondale, IL 62901

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Patching and Resurfacing on IL 13
Infrastructure
Results
$2,000,000 est. value
Carbondale, IL 62902

Replace Corrugated Metal Pipes in the Southwest Quadrant - SS9902- City of Carbondale
Infrastructure
Conception
$500,000 CJ est. value
Carbondale, IL 62901

0.75 Miles of Resurfacing on North 6th Street
Infrastructure
Bidding
$4,500,000 CJ est. value
Murphysboro, IL 62966

Last Updated 10/16/2023 06:33 AM
Project Title

Patching, Milling, Resurfacing and Shoulders on IL 3

Physical Address View project details and contacts
City, State (County) Grand Tower, IL 62942   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

25.4 miles of patching, milling, resurfacing and shoulders on IL 3 from Howardton Road, near Grand Tower, to the Cape T intersection.ro. Region 5 District 9 Federal Project # County(s) Jackson, Alexander, Union Key Route(s) FAP 312 Marked Route(s) IL 3 Section(s) (131,132,102,101) RS-8 State Job #(s) C-99-052-23 PPS #(s) 9-00599-0000 9-00601-0000 9-00710-2420 9-00886-0000 9-00939-0000 Completion Date: 220 Working Days Questions not accepted as of November 07, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 27, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 097 - patching, milling, resurfacing and shoulders on IL 3

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents