Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Cuyahoga Hills Juvenile Correctional Facility HVAC Replacement
Bidding
$915,000 est. value
Highland Hills, OH 44128

HVAC Technical Services for Forced Air Furnaces
Term Contract
Bidding
Cleveland, OH

Public Auditorium Music Hall Air Handling Units
Post-Bid
Cleveland, OH 44114

King Kennedy North Day Care HVAC Repair or Replacement
Post-Bid
Cleveland, OH 44104

USCG HVAC Maintenance and Repair Ohio
Results
Cleveland, OH 44114

Y--1B229 Mechanical Room (VA-19-00027342)
Results
$250,000 to $500,000 est. value
Cleveland, OH 44106

Parma #2 Boiler Replacement Boiler Replacement
Bidding
Cleveland, OH

HVAC Improvements and Upgrades
Post-Bid

Steam Humidification System Repairs & Replacement of Cooling Tower Fill Project
Results
$250,000 to $500,000 est. value
Cleveland, OH 44113

Ytterbium (YB) Fiber Optic Solid State Laser with Chiller Unit, and Laser Beam Optics for Uniform Beam Profile
Post-Bid
Cleveland, OH 44135

Stokes Mall Boiler Replacement
Results
$225,000 to $350,000 est. value
OH

Lubrizol Brecksville - Idea Center Boiler
Renovation
Post-Bid
Brecksville, OH 44141

Terminal Boiler Replacement
Results
Cleveland, OH 44135

RFI Only - NASA Glenn Research Center 9x15 Wind Tunnel Heat Exchanger Bundle Replacement
Post-Bid
Cleveland, OH 44135

Last Updated 11/24/2020 08:42 AM
Project Title

Domestic Hot Water Boiler Replacement at Laronde Apartments

Physical Address View project details and contacts
City, State (County) Shaker Heights, OH 44120   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing gas-fired domestic hot water boiler and associated accessories and components unless noted to remain. Phased installation of two (2) new gas-fired domestic water boilers and associated components for a complete and operable domestic hot water system. Extension of gas piping and domestic hot water piping as required. Gas-fired hot water boiler testing at the completion of installation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents