Similar Projects
Fallston Library Stormwater Management Retrofit
Bidding
$175,000 to $250,000 est. value
Bel Air, MD

Hand Mowing, Trimming, and Litter Pickup at Various Locations
Bidding
Less than $100,000 est. value
MD

Landscaping Maintenance Services for MDOT MVA Salisbury Branch
Post-Bid
Harmans, MD

MDOT/SHA Handmowing - Somerset County
Post-Bid
Princess Anne, MD 21853

Phase 2 Integrated Roadside Vegetation Management (Irvm) and Native Plant Establishment along Us 50 from The Anne Arundel/Prince George`S County Line To I-97 And Along I-97 From Us 50 To Md 3
Term Contract
Results
$1,000,000 to $2,500,000 est. value
Hanover, MD 21076

Tree Line Spraying Along the State Highway Roadsides in Somerset, Wicomico, Dorchester, and Worcester Counties
Results

Hand Mowing, Trimming, and Litter Pickup at Various Locations West of Bel Air in Harford County
Bidding
Less than $100,000 est. value
MD

Stormwater Maintenance Facility Services
Term Contract
Post-Bid
MD

Vac-Jet Truck and Pipe Inspection Services
Results
Less than $50,000 est. value
Salisbury, MD 21802

Roadway Tree Trimming
Term Contract
Bidding
Elkton, MD

Herbicide Solution Applications, Gaithersburg Maintenance Facility
Post-Bid
Less than $50,000 est. value
Gaithersburg, MD 20878

Tree Pruning/Removal and Associated Services
Results
Towson, MD 21204

Inspection and Cleaning of Storm Drainage Systems
Bidding
$1,000,000 to $5,000,000 est. value
Largo, MD

Infrastructure Repair Services, Term Contract
Term Contract
Post-Bid
$30,000,000 est. value
Towson, MD 21204

On-Call Drainage and Stormwater Remediation
Results
$5,000,001 to $10,000,000 est. value
Baltimore, MD

Last Updated 04/22/2021 11:37 AM
Project Title

Stormwater Maintenance and Construction

Physical Address View project details and contacts
City, State (County) Prince Frederick, MD   (Calvert County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Landscaping, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK A. Maintain, retrofit, and repair stormwater management devices on Calvert County Government owned property or right of ways or both. B. Accelerate miscellaneous Calvert County Government capital projects as directed by Calvert County Government which are in the best interest of Calvert County Government, e.g., capital project work that requires stormwater management construction or repair or both. Construction may include submerged gravel wetlands (See Attachment A), micro-bio-retentions, pocket ponds, sand filters, or other approved devices. Plans shall be provided for aforementioned devices prior to construction. 1) Engineering specifications and drawings for design construction shall be provided by Calvert County Government. C. Trees All trees in the stormwater device and appurtenances shall be removed. The stump shall be removed, and the earth shall be recompacted within the stump hole at the Project Manager’s discretion. Cleaning 1) All leaves, brush, sticks, bushes, vines, briars, unwanted vegetation such as invasive and nuisance species), logs, branches, trash, and dead vegetation shall be removed from the stormwater device. 2) All accumulated trash, debris, and sediment shall be removed from all areas of the stormwater device including the ten-foot (10’) buffer around the fence or perimeter of the pond, the base, side slopes or embankment, top of the slope or embankment, trash rack, retrofit and openings of the inlet and outlet structures. E. Finishing 1) Repair bare or eroded areas by applying seed and straw to said areas. All slopes three (3) to one (1) or greater shall receive erosion control matting. 2) Landscape, seed, and straw in and around the stormwater device as needed. F. Spraying 1) Spray the stormwater device with approved herbicide by a commercial licensed pesticide applicator. A copy of the Contractor’s or subcontractor’s Commercial Pesticide Applicator License shall be submitted with the bid. 2) The entire stormwater device boundary shall be sprayed in a manner that shall not harm landscaped areas. 3) Spraying shall be no less than five (5) calendar days after the pond is cut and before. 4) The ten-foot (10’) buffer area around the device shall also be sprayed. The ten-foot (10’) begins from the fence if there is a fence, otherwise it begins from the estimated edge of the top of the embankment.

Details

Division 31 - Earthwork, Soil Treatment, Vegetation Control.
Division 32 - Exterior Improvements, Turf and Grasses, Seeding, Plants, Trees.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents