Similar Projects
College Park Airport - Hangar Renovation - 4.99.0035 - Prince George's County
Renovation
Conception
$250,000 CJ est. value
College Park, MD 20740

South Apron Safety Enhancement - Queen Anne's County
Renovation
Conception
$4,040,000 CJ est. value
Centreville, MD 21617

Inspection, Repair, and Maintenance of Hangar Doors at Martin State Airport
Term Contract
Design
Baltimore, MD 21220

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

D/B B306 REPAIR HANGAR DOOR TRACKS - NAS PAX RIVER
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Patuxent River, MD 20670

Southwest Airlines BWI Regional Maintenance Facility
New Construction, Infrastructure - 130,000 SF
Post-Bid
$135,000,000 CJ est. value
Baltimore, MD 21240

Airport Maintenance Facility
Results
Salisbury, MD 21804

Repair Hangar 4 Building 1734
Renovation
Bidding
$20,000,000 CJ est. value
Andrews Air Force Base, MD 20762

P3002 Hazardous Cargo Pad, Joint Base Andrews
New Construction, Infrastructure
Post-Bid
$33,500,000 CJ est. value
Andrews Air Force Base, MD 20762

Munitions Load Crew Training Facility at Joint Base Andrews
New Construction, Infrastructure - 8,279 SF
Post-Bid
$10,000,000 CJ est. value
Andrews Air Force Base, MD 20762

Last Updated 01/04/2023 12:32 PM
Project Title

RFQ Contractor - Aircraft Hangar Roof Renovation

Physical Address View project details and contacts
City, State (County) Andrews Air Force Base, MD 20762   (Prince Georges County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids
Project Status Feasibility Study, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Business and you are interested in this project please respond appropriately. Project Location: Joint Base Andrews, MD Project Description: Repair/replace of the exterior envelope of two aircraft hangars at Joint Base Andrews which includes roof repair (approximately 16,000 SF), exterior window, personnel door and translucent panel replacement, and installing lightning protection and snow guards. Contract duration is estimated at 365 calendar days. The estimated cost range is between $1,000,000 and $5,000,000. NAICS code is 238160. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this survey via email by WednTuesday, November 28, 2022, by 1:00 PM Eastern Standard Time. Responses should include: Identification and verification of the company's small business status. Contractor's Unique Entity Identifier (UEI) and CAGE Code(s). Documentation from the firm's bonding company showing current single and aggregate performance and payment bond limits. Description of Experience - Provide descriptions your firm's past experience on up to three (3) projects with greater than 95% construction complete, or those projects completed within the last five years which are similar to this project in size, and scope. Provide documentation demonstrating experience for construction of similar type buildings and managing multiple sub-contractors. Demonstrate experience including self-performing 15% of the construction. Provide documentation demonstrating experience for projects of similar type projects. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. a) Projects similar in scope to this project include: New construction or renovation projects which include roof repair and/or replacement. b) Projects similar in size to this project include: Projects that are at least 12,000 SF. c) Based on definitions above, for each project submitted include: Current percentage of construction complete and the date when it was or will be completed. Size of the project Scope of the project The dollar value of the construction contract. The percentage of work that was self-performed. Must be at least 15% self-performed. Type and percentage of the contract cost, excluding cost of materials, that was self-performed as physical vertical and horizontal construction by construction trade(s). State whether the project was design/build or design/bid/build. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm's own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. Email responses and any questions to Lindsay Lawrence at Lindsay.B.Lawrence@usace.army.mil. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately for responses to this market survey. NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer - System for Award Management, which indicates "All payments by the Government under this contract shall be made by electronic funds transfer (EFT)." Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected. ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

16,000 SF.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents