Similar Projects
Folly River Paddle Sport Access Facility
Infrastructure
Bidding
Folly Beach, SC 29439

Dunes Walkover Project
Infrastructure
Bidding
Myrtle Beach, SC

Building ADA Compliant Ramp
Post-Bid
Less than $20,000 est. value
Rembert, SC

Battery Pringle Revetment Renovation Project. The Dill Property
Renovation
Post-Bid
James Island, SC

Belton Kayak Launch
Results
$1 to $1,000,000 est. value
Belton, SC 29627

Surfside Beach Fishing Pier Restoration Project
Results
Surfside Beach, SC 29575

Construction of a Boating Access Facility on Lake Greenwood
Infrastructure
Bidding
Greenwood, SC 29649

Surfside Beach Fishing Pier Reconstruction Project
Post-Bid
Less than $13,400,000 est. value
Surfside Beach, SC 29575

Whitehall Drive Boardwalk
Results
Beaufort, SC 29902

Construction of Boat Landing on Broad River at Lockhart
Infrastructure
Bidding
$300,000 to $600,000 est. value
SC

Charleston - Santee Coastal Reserve Dock Replacement
Post-Bid
$250,000 to $350,000 est. value
McClellanville, SC 29458

Marina Dock Rehabilitation
Results
Isle of Palms, SC 29451

State Park Piers Repair - Hunting Island
Post-Bid
$750,000 to $1,000,000 est. value
Saint Helena Island, SC 29920

Marine Contractors for the Construction of the Battery Park Pedestrian Bridge
Results
North Charleston, SC 29406

Furnish and Install A Dock at Pack's Landing
Post-Bid
Rimini, SC

Reported 11/18/2021 12:00 AM
Project Title

Pier Romeo Recapitalization; North Charleston, SC

Physical Address View project details and contacts
City, State (County) North Charleston, SC   (Berkeley County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $42,000,000 to $52,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Pier Romeo facility is severely degraded and unsafe for use. The recapitalization will enable the dock facility to support the NOAA Ships Nancy Foster, Ronald H. Brown, and other visiting NOAA vessels. The proposed action involves the demolition of derelict structures and the construction of a new pier, access trestle, and shore infrastructure and improvements to support the berthing of the Nancy Foster and Ronald H. Brown on a long-term basis. This project will allow NOAA ships to have access to utility services at the new dock face that includes an adequate flow of potable water, black and grey water removal, oily sludge removal, along with the electrical and network service connections. The new pier will be accessed by a new approach trestle and the new warehouse will be used to store ship supplies and equipment. The requirement will also include dredging and a sheet pile sea wall to address sea level rise in Charleston

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents