Similar Projects
Oak Harbor Intermediate School
New Construction, Renovation
Conception
Oak Harbor, WA 98277

White River High School
Renovation
Conception
$4,178,000 est. value
Buckley, WA

New Transition Services Educational Facility
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bellevue, WA

High School Addition
New Construction, Addition - 15,000 SF
Design
Ridgefield, WA

Restorative School Renovation
Renovation
Bidding
$500,000 to $600,000 est. value
Bremerton, WA 98312

Lindbergh High School Modernization and Additions Bid Package- 4.1, 6.1, 7.1, 7.2, 8.1, 9.1-5, 32.2
Renovation, Addition
Bidding
$5,641,697 est. value
Renton, WA 98058

ESD 112 Mental Health Center
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98661

Avanti High School and Annex Remodel
Renovation
Post-Bid
Olympia, WA 98501

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Design-Build Services Tacoma Online Learning - Tenant Improvements
Renovation - 12,961 SF
Results
$5,000,000 est. value
Tacoma, WA 98402

Capital Projects Bond
Renovation, Addition
Conception
Bothell, WA

Cornerstone Christian Academy Middle/High School
Renovation
Design
Battle Ground, WA 98604

Lindbergh High School Modernization and Additions BP- 8.2, 10.1
Renovation, Addition
Bidding
$1,642,000 est. value
Renton, WA 98058

District Maintenance Building Improvements
New Construction
Post-Bid
$2,350,000 est. value
Steilacoom, WA

Architectural Services for High School Addition
New Construction, Addition - 15,000 SF
Results
Ridgefield, WA 98642

Reported 06/23/2022 12:00 AM
Project Title

Chief Kitsap Academy (CKA) Phase 1 Project

Physical Address View project details and contacts
City, State (County) Poulsbo, WA 98370   (Kitsap County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope under this project defined as Chief Kitsap Academy (CKA)- Phase 1 consists of targeted systems upgrade to fit within the current Small Districts Grant funding. The project scope covers work for Buildings 1 & 3 of the CKA.. The Construction portion of this project involves relocating existing units from the basement to the attic and add DOAS per zone for both Bldgs. 1 & 3. The building enclosure scopes include a targeted repair of 5 exiting windows and replace 2 doors for Bldg. 1 and a targeted cladding repair of the south and west, facing facades of Bldg. 3 as well as the replacement of the existing mulled window on the south elevation.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents