Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Nuclear Command, Control and Communication Acquisition Management Facility
New Construction
Design
$25,000,000 to $100,000,000 est. value
Hanscom A F B, MA

Repair (Sustain) AFLCMC Facility
Renovation
Design
$10,000,000 est. value
Hanscom A F B, MA

Northampton Armory, Boiler, Exterior Doors, Windows and Roof Replacement - GC Bid
Renovation
Bidding
$2,600,000 CJ est. value
Northampton, MA 01062

Repair (Sustain) Air Force Life Cycle Management Center Facility
Renovation
Bidding
$10,000,000 CJ est. value
Hanscom AFB, MA 01731

Repair Communications Facility
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Hanscom A F B, MA 01731

2021 MATOC Ohio National Guard
New Construction, Renovation, Addition
Post-Bid
Melrose, MA - Chillicothe, Columbus, Mansfield, Ravenna, Springfield, Swanton, OH 43212

Replace Roofing System Enlisted Barracks 5242, 5243, 5244 and 5222
Results
$1,500,000 to $1,800,000 est. value

Replace Roofing System Enlisted Barracks 5242, 5243, 5244 and 5222
Results
$1,500,000 to $1,800,000 est. value

RFQ - Generator Maintenance and Electrical Testing
Term Contract
Conception
Northampton, MA 01053

Sources Sought Synopsis Small Purchase Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) Hanscom Air Force Base, MA
New Construction, Renovation
Design
$10,000,000 est. value
Hamilton, Hanscom A F B, Sandwich, Scituate, MA 01982

RFQ Contractor - Natick Soldier System Center (NSSC) - Building 1 NEC Admin Renovation
Renovation, Infrastructure - 2,000 SF
Bidding
$5,000,000 CJ est. value
Natick, MA 01760

HBS Office Renovation
Renovation
Post-Bid
Hanscom A F B, MA

Automated Multipurpose Machine Gun (MPMG) Range at Devens Reserve Forces Training Area (RFTA), Massachusetts
New Construction
Results
$5,000,000 to $10,000,000 est. value
Ayer, MA

Last Updated 08/17/2022 02:03 PM
Project Title

Northampton Armory, Boiler, Exterior Doors, Windows and Roof Replacement - Sub Bid

Physical Address View project details and contacts
City, State (County) Northampton, MA 01062   (Hampshire County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor Qualification DCAMM Certificate SUBTRADES Section 04 20 00 - Masonry Work Section 07 10 00 - Waterproofing, Dampproofing and Caulking Section 07 50 00 - Roofing and Flashing Section 08 50 00 - Metal Windows Section 09 90 00 - Painting Section 22 00 00 - Plumbing Section 23 00 00 - HVAC Section 26 00 00 - Electrical Work The combined participation goal reserved for such enterprises shall not be less than 10.4% of the final contract price including accepted alternates

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents