Similar Projects
American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Church Street Parking Lot
Infrastructure
Bidding
$200,000 CJ est. value
Romeo, MI 48065

Church Street Parking Lot
Infrastructure
Bidding
$200,000 CJ est. value
Romeo, MI 48065

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Bundle 3 Rest Areas Ada Eastern Lower Peninsula - Exterior
Post-Bid

Sidewalk Rehabilitation Program - 2020 CDBG
Results
New Haven, MI 48048

0.33 MI of Hot Mix Asphalt Shared Use Path, Concrete Curb, Gutter, Sidewalk and Ramps, Aggregate Base And Pavement Markings
Results
MI

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Mound and Jewell Pathway Gaps
Infrastructure
Design
$800,000 CJ est. value
New Baltimore, MI 48051

Street Rehabilitation Program(Margo Drive, James Curtain Drive)
Infrastructure
Post-Bid
New Haven, MI 48048

MISD - Admin Parking Lot Expansion
Results
Less than $2,048,000 est. value
Clinton Township, MI

PMC Project-Crack and Joint Repairs on M-3 Macomb County
Infrastructure
Post-Bid
Mount Clemens, MI

Last Updated 08/26/2022 09:03 AM
Project Title

2022 Asphalt Pavement Repairs

Physical Address View project details and contacts
City, State (County) Warren, MI 48093   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project currently has 2 addendum on it, to obtain these please contact the Owner Directly Milling existing pavement surface regardless of material, concrete base and curb repairs, Detail 7 joint repairs and repaving with HMA. The scope of the project is to perform repairs of deteriorated sections of pavement and utility structures in various locations throughout the City of Warren. The streets designed for repair in this program are Greentree, Blair, Alger, Hoover. General Requirements - Bid Deposit Required - Insurance Required - Warranty Information Required - Installation Required - Prevailing Wage Required - Certified Payroll Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 0.1 % - Labor and Materials Bond 100 % - Payment Bond 100 % Job Location City of Warren - Various Locations Question Acceptance Deadline 07/11/2022 12:00 PM EDT Questions are submitted online No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents