Broad Street Retaining Wall - 23-12 - City of Bristol
Infrastructure
Conception
$1,800,000 est. value
Bristol, CT 06010

Arch Street Downtown Complete Streets Improvements - City of New Britian
Infrastructure
Conception
New Britain, CT

Tootin' Hills Elementary School Basement Drainage Project
Infrastructure
Design
$400,000 CJ est. value
West Simsbury, CT 06092

The Beeline Trail Phase 3 (Corbin Avenue to Plainville Town Line) - City of New Britain
Infrastructure
Design
$3,200,000 est. value
New Britain, CT

Hazardous Material Abatement and Stabilization of 1240 Albany Avenue
Term Contract, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Hartford, CT 06112

Police Department Fuel Station Improvements
Infrastructure
Bidding
$290,000 CJ est. value
Glastonbury, CT 06033

New Parking Lot at Gaylord Towers
Post-Bid
Bristol, CT 06010

Contractor Rate Submittal to Public Works for 2021-2023
Term Contract
Post-Bid
Suffield, CT

2021 Permanent Street Curbing Installation
Results
West Hartford, CT

2021 Reclamation
Results
West Hartford, CT

New Pool and Bathhouse - Eisenhower Park
New Construction, Infrastructure
Pending Verification
$2,500,000 CJ est. value
West Hartford, CT 06117

RFQ Design - Architectural and Engineering Services for the, Demolition and New Construction at Mary Shepard Place
Demolition, New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Hartford, CT 06120

John Downey Drive Roadway and Pedestrian Improvements - City of New Britain
Alteration
Conception
$3,000,000 est. value
New Britain, CT 06051

The Beeline Trail Phase 2 (West Main Street To Corbin Avenue) - City of New Britain
Alteration
Design
$600,000 est. value
New Britain, CT

Riverfront Community Center Pickleball Courts
Infrastructure
Bidding
$205,775 CJ est. value
Glastonbury, CT 06033

Last Updated 08/04/2022 01:37 PM
Project Title

Phase 1 - Site Enabling Work State Project

Physical Address View project details and contacts
City, State (County) Farmington, CT 06032   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

*The Phase 1 bid process has closed. This phase of work consists of the construction of a temporary bituminous parking lot in the field located adjacent to the Farmington Library, the installation of a temporary pedestrian path, temporary fencing and gates, as well as traffic control signage. This phase of the work is to prepare the project site and reroute traffic patterns prior to commencing the larger project, which is the construction of the new Farmington High School. This phase of the work is scheduled to be performed during Summer 2022. The Owner, Town of Farmington, has contracted with O&G Industries to serve as the Construction Manager (CM). 7. No oral, telephone, telegraphic or hard copy proposals will be considered. All bids shall stand available for acceptance for a period of ninety (90) days from the date proposals are received. 8. No bid shall be accepted from any person/company who is in arrears to the Owner upon debt, or contract, or who is a defaulter as surety or otherwise upon obligations to the Owner. 9. The Owner or its Designee reserves the right to reject any or all bids, without stating reasons therefor, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced, or conditional bids and to reject the bid of any bidder if the Owner or its Designee believes that it would not be in the best interest of the Owner or the project to make an award to that bidder, whether because the bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner or its Designee. The Owner or its Designee reserves the right to waive informalities and to negotiate contract terms with one or more bidders without reopening the bidding process insofar as such negotiations are not violative of applicable competitive bidding statutes or law. In the event of a tie low bid, the Owner reserves the right to take into account the residency of bidders within the Town of Farmington and/or location of the bidder's business within the Town of Farmington in awarding the bid. For questions regarding Addenda, or to confirm the bid date, contact Mark Carroll at O&G Industries, Inc. (860) 496-4233 or email markcarroll@ogind.com. 25% SBE & 6.25% MBE

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents