Similar Projects
Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Woodland Clinic Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,052,000 CJ est. value
Woodland, MS 39776

Construction of the 2022 Coahoma County Ilex Project
New Construction, Renovation, Infrastructure
Bidding
$350,000 CJ est. value
Clarksdale, MS 38614

Kossuth High School Bleachers
Renovation
Post-Bid
Corinth, MS 38834

Softball Pavilion
New Construction
Post-Bid
Houston, MS 38851

DCS Accessible Playground Additions
Addition
Results
$242,482 est. value
Olive Branch, MS 38654

George Regional Health Systems Multi-Specialty Complex
New Construction, Infrastructure
Results
$2,922,000 CJ est. value
Lucedale, MS 39452

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

The Cascades
New Construction, Infrastructure - 400,000 SF
Pending Verification
$385,000,000 CJ est. value
Olive Branch, MS 38654

Woodland Park Walking Trail
Infrastructure
Bidding
$200,000 CJ est. value
Woodland, MS 39776

Biggersville High School Football Bleachers
New Construction
Post-Bid
Corinth, MS 38834

Abraham House of God
New Construction, Infrastructure
Results
$2,800,000 CJ est. value
Horn Lake, MS 38637

Scannell Properties Industrial Development / Olive Branch
New Construction, Infrastructure - 488,000 SF
Pending Verification
$262,000,000 CJ est. value
Olive Branch, MS 38654

Bridge Replacement on Brooklyn-janice Road
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Brooklyn, MS 39425

Last Updated 02/10/2023 04:37 AM
Project Title

Love Addition Park Improvements New Park Bathroom Building Project

Physical Address View project details and contacts
City, State (County) Lumberton, MS 39455   (Lamar County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $92,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all materials and equipment necessary, to wit: Lumberton Love Addition Park Improvements New Park Bathroom Building Project Proposals shall be submitted upon the blank bid forms provided with the drawings and general conditions and scope of work. Bids may be held by The City of Lumberton, MS for a period not to exceed 45 days from the date of the bid opening for the purpose of evaluating bids prior to award of the contract. The City of Lumberton, MS reserves the right to reject any and all bids, and to waive any informalities in the bids received. Bids on the project must be received on or before the time specified above and no bid may be withdrawn after the scheduled closing time and date for the receipt of bids. All bids submitted must comply with the requirements of Chapter 3, Title 31 (Sections 31 3 1, et seq.) of Mississippi Code of 1972, as amended, and the performance of any contract awarded shall be bonded in accordance with Chapter 5, Title 31, of the Mississippi Code of 1972, as amended. The City of Lumberton is an Equal Opportunity Employer, and hereby notifies all bidders will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents