Similar Projects
Concrete Sidewalk and Curb Ramp Repairs 2023
Infrastructure
Bidding
$1,000,000 CJ est. value
Greensboro, NC 27401

McLeansville Regional Readiness Center
New Construction, Infrastructure - 85,000 SF
Bidding
$40,000,000 CJ est. value
McLeansville, NC 27301

On-Call Concrete Delivery
Term Contract
Sub-Bidding
Asheville, NC 28801

Richmond Hill Tee Pads
Infrastructure
Sub-Bidding
$42,000 CJ est. value
Asheville, NC 28806

Montlieu Avenue Improvements Concrete Structures
Alteration
Post-Bid
High Point, NC 27268

Concrete for 5th Street BAA Project
Alteration
Post-Bid
Roanoke Rapids, NC 27870

Mclin Creek Outfall Reconstruction
Results
Claremont, NC

Repairs SPG-2 Concrete B4753
Term Contract
Results
$25,000 est. value
Cherry Point, NC 28533

Construction of Clay County 911 Center
New Construction, Infrastructure - 5,200 SF
Pending Verification
$3,552,048 CJ est. value
Hayesville, NC 28904

Modify Fuel Fill Piping, Building 6011
Infrastructure
Bidding
$100,000 CJ est. value
Marine Corps Air Station Cherry Point, NC 28532

Fiscal Year 2022 Concrete Repair Project
Alteration
Post-Bid
Morrisville, NC

Concrete Installations
Alteration
Results

Concrete for Eno River
Alteration
Post-Bid
Durham, NC

Various Concrete Items, Upon Request
Alteration
Results

Concrete Installation at OT Sloan T-Ball Complex
Alteration
Post-Bid
Sanford, NC 27330

Last Updated 03/20/2023 07:07 PM
Project Title

North Buncombe Middle School Security Addition

Physical Address View project details and contacts
City, State (County) Weaverville, NC 28787   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $820,750 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Buncombe County Schools is pleased to announce the upcoming bid for the North Buncombe Middle School Security Addition. The project will be an important addition to the School and includes: - Sitework, including but not limited to demolition of existing sidewalks, grading, drainage, and repaving around the new security addition. - Construction of the addition itself including demolition of existing canopy, new footings, structural steel structure, load bearing masonry walls with brick veneer, doors and hardware, interior finishes and other work included in the construction documents. The roof is installed by a separate contractor. GC to coordinate with roofing contractor. - Electrical work includes lighting, power, rough in for low voltage for communication and access control, distribution, and other work included in the construction documents. - Mechanical work includes electrical heater and ventilation fans, controls and other work included in the construction documents. The expected Award on this project will be the 1st week of March, after approval of the low responsive, responsible bidder by the Board of Education. Construction will take place in Spring and Summer and be complete by mid August 2023. Detailed information will be provided at the Pre-Bid meeting and in the posted Contract Documents. Bids will be received for Single Prime. All proposals shall be lump sum and secured by a bond. The Owner reserves the unqualified right to reject any and all proposals. Last days for questions are due by noon on 2/03/2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents