Similar Projects
Indiana Harbor and Canal Confined Disposal Facility Wastewater Treatment Plant
Bidding
$1,000,000 to $5,000,000 est. value
East Chicago, IN 46394

Monroe WTP Residuals Pumping Improvements
Post-Bid
Bloomington, IN 47401

Grit Dewatering Improvements
Post-Bid
Gary, IN 46401

Wastewater Treatment Plant Improvements
Results
Bedford, IN 47421

Wastewater System Improvements and Septic Relief
Results
Huntington, IN 46750

Virgin Granular Activated Carbon
Post-Bid
Hammond, IN

WWTP Clarifier Rehabilitation
New Construction, Demolition
Results
South Bend, IN 46601

Jasper Regional Water District (NORWEJ) Water Supply and Treatment Plant No. 2
Post-Bid
DeMotte, IN 46310

Water Pollution Control Plant Trim Blower Improvements
Results
Fort Wayne, IN

Aqua Avon WWTP Expansion Phase VI
Post-Bid
Avon, IN 46123

WPCP Dechlorination Injection Improvements
Results
Fort Wayne, IN 46803

Butler WWTP Upgrades
Post-Bid
Butler, IN 46721

Wastewater System Improvements
Results
$851,000 est. value
Terre Haute, IN 47876

Topeka Water Treatment Plant
Renovation, Addition
Post-Bid
$200,000 est. value
Topeka, IN 46571

Water Utility Improvements - Division A - WTP and Well Improvements
Results
Less than $2,360,000 est. value
La Crosse, IN

Reported 10/12/2021 12:00 AM
Project Title

Backflow Prevention Water Treatment Plants

Physical Address View project details and contacts
City, State (County) Columbus, IN   (Bartholomew County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes but is not limited the installation of new water meters and dual reduce pressure zone back flow preventers at each of the two Water Treatment Plants. The work includes the construction of a building to house a new water meter and dual reduced pressure zone backflow preventers at Water Treatment Plant 1 and the installation of a new water meter and dual backflow preventer at Water Treatment Plant 2.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents