Similar Projects
Ellis Estates
New Construction, Infrastructure
Conception
$15,750,000 CJ est. value
Fayetteville, AR 72703

Nazareth Retreat Center - Phase 1
New Construction, Infrastructure - 13,112 SF
Conception
$3,375,000 CJ est. value
Fayetteville, AR 72701

JA Riggs Facility Expansion
New Construction, Infrastructure - 10,112 SF
Design
$2,700,000 CJ est. value
Springdale, AR 72762

Parsons Stadium Expansion
Addition, New Construction, Renovation, Infrastructure
Design
$12,000,000 CJ est. value
Springdale, AR 72764

Lincoln Phase I Sewer Rehabilition
Infrastructure
Bidding
$300,000 CJ est. value
Lincoln, AR 72744

Lincoln Phase I Sewer Rehabilition
Infrastructure
Bidding
$300,000 CJ est. value
Lincoln, AR 72744

Washington County Jail Expansion
Addition, Infrastructure
Post-Bid
$116,000,000 CJ est. value
Fayetteville, AR 72701

Multi-User Silicon Carbide National Research Fabrication Laboratory (MUSiC Lab) - University of Arkansas-Fayetteville
New Construction, Infrastructure
Post-Bid
$23,000,000 CJ est. value
Fayetteville, AR 72701

Lee Creek Stream Restoration at Devil's Den State Park
Infrastructure
Results
$430,000 CJ est. value
West Fork, AR 72774

Highway 412 Water East Improvements
Infrastructure
Results
$3,069,050 CJ est. value
Tontitown, AR 72762

University of Arkansas Anthony Timberlands Center for Design and Materials Innovation
LEED Certification, New Construction, Infrastructure - 45,000 SF
Construction
$26,500,000 CJ est. value
Fayetteville, AR 72701

Lewis Automotive Mall
New Construction, Infrastructure - 89,946 SF
Construction
$20,000,000 CJ est. value
Fayetteville, AR 72704

Markham Cottages
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Chandler Crossing
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Fayetteville, AR 72703

Nazareth Retreat Center - Phase 2
New Construction, Infrastructure - 14,880 SF
Conception
$1,500,000 CJ est. value
Fayetteville, AR 72701

Last Updated 06/08/2023 01:01 AM
Project Title

Lift Station and Sewer System to Fayetteville

Physical Address View project details and contacts
City, State (County) Greenland, AR 72701   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a gravity sewer main, lift station, force main, and related appurtenances and improvements to connect the Greenland wastewater system to the Fayetteville wastewater system. Work covered by Contract Documents: The completed Work includes constructing a lift station and combination of gravity and force main sewer lines that connect to the City of Fayetteville's wastewater system. More specifically, the Project includes, but is not limited to, construction of the following: 1. Sanitary sewer lift station and related site and utility improvements. 2. Approximately 6,200 feet of 10-inch force sewer and related appurtenances through Greenland. 3. Approximately 3,500 feet of 15-inch gravity main and related appurtenances through Greenland. 4. Approximately 2,000 feet of 18-inch gravity main and related appurtenances through Fayetteville. The Project is located in the City of Greenland, AR 72737 and Washington County. Final completion- 425 consecutive calendar days

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents