Similar Projects
El Vado Hydroelectric Plant Transformer Replacement Project
Bidding
El Vado, NM 87544

On-Call Electrical Contractor Services
Post-Bid
Los Alamos, NM 87544

Ups With Installation
Post-Bid
NM

1000 KVA 3 Ph Padmount Distribution Transformer
Results
Aztec, NM

Electrical Services
Results
Clovis, NM 88101

Z--CAVE 169636 - Replace Old/Failing Primary Electric
Post-Bid
$5,000,000 to $10,000,000 est. value
Carlsbad, NM 88220

Concrete Vaults and Pads
Results
Less than $13,284 est. value
Aztec, NM

Casino Lighting Retrofit and Installation
Post-Bid
Albuquerque, NM 87113

Replace Emergency Generator at Alamogordo Police Department
Results
Less than $77,554 est. value
Alamogordo, NM 88310

Electrical/Mechanical Design and Installation
Post-Bid
Albuquerque, NM 87113

SJCP Chama Office Shop Lighting
Results
Chama, NM 87520

Fiber Construction
Post-Bid
Carlsbad, NM 88220

N--Chama SCADA Replacement San Juan-Chama Project, C
Results
San Juan, NM 140R4019Q0

Transformers
Post-Bid
$1,000,000 to $5,000,000 est. value
Clovis, NM 88101

15KV 1000 MCM Copper Power Cable
Results
Los Alamos, NM 87544

Last Updated 07/08/2020 03:12 PM
Project Title

Modernize Electrical and HVAC Redundancy

Physical Address View project details and contacts
City, State (County) Clovis, NM 88101   (Curry County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

GENERAL DESCRIPTION: The Government is currently seeking information to identify market capabilities for establishing redundant electrical power, replacing two, 200 ton primary HVAC (heating, ventilation and air conditioning) water-cooled chillers with air-cooled chillers, and installing dedicated HVAC for Ground Control Station (GCS) bays. The project consists of establishing dual electrical systems within a single facility, which will support GCS servers and bays. The electrical set up shall be established to permit independent operations on either side of the bay. The electrical work also includes upgrading power to the facility via the transformer. Lastly, the project shall create a fully redundant HVAC system for the GCS bays, and replace the two primary chillers with equivalent water cooled chillers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents