Similar Projects
Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

Burt County 2022 Overlays
Infrastructure
Bidding
$4,657,852 CJ est. value
Craig, NE 68019

Burt County 2022 Overlays
Infrastructure
Bidding
$4,657,852 CJ est. value
Craig, NE 68019

N-51, US-77 - US-75
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value
NE

District 5 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

ACC Overlay Improvements
Infrastructure
Results
Plattsmouth, NE

15th Street Pavement Extension
Infrastructure
Results
Plattsmouth, NE 68048

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

SID5 Bay Hills Public Parking Lot
Infrastructure
Construction
$116,592 CJ est. value
Plattsmouth, NE 68048

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

David City Wastewater Treatment Plant (WWTP)
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
David City, NE 68632

Replace and Upgrade Main on Marian Road from 7th Street to 9th Street - City of Hastings
Infrastructure
Conception
$350,000 CJ est. value
Hastings, NE 68901

Last Updated 01/04/2023 05:32 AM
Project Title

2022 CDBG Street Improvements

Physical Address View project details and contacts
City, State (County) Dannebrog, NE 68831   (Howard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $430,916 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: First Street from Roger Welsch Avenue to Depot Street from Mill street North to Pioneer Boulevard. To improve the design and construction of First Street from Roger Welsch Avenue to Depot Street from Mill Street North to Pioneer Boulevard. These improvements will include 8" concrete pavements, ADA ramps, storm sewer repair, and the reconstruction of the intersection return at Highway 58/Roger Welsch Avenue. The second portion of this project is to improve Copenhagen Street from Mill Street to Pioneer Boulevard. These improvements include either concrete or asphalt roadway with no curb and gutter with grading improvements. If you have any questions, contact us at 402.371.6416.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents