Similar Projects
The River District Mixed Use Development MASTER REPORT
New Construction, Demolition - 750,000 SF
Conception
$1,000,000,000 CJ est. value
New Orleans, LA 70181

Airfield Rehabilitation Program - Runway 2-20 - City of New Orleans
Infrastructure
Conception
$32,000,000 CJ est. value
New Orleans, LA 70130

George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Design
$300,000 CJ est. value
New Orleans, LA 70118

Harold Gene Devore Playground
Infrastructure
Design
$230,000 CJ est. value
New Orleans, LA 70114

Deckhand Training Center
New Construction, Infrastructure
Bidding
$1,300,000 CJ est. value
New Orleans, LA 70119

RFQ Construction Manager at Risk (CMAR) - Louisiana International Terminal Wharf and Ramps
Infrastructure
Bidding
$1,000,000 CJ est. value
New Orleans, LA 70130

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Plum Orchard Group D (FRC) - (Re-Bid)
Infrastructure
Post-Bid
$100,000 CJ est. value
New Orleans, LA 70112

Oak Park Drainage Improvements (Re-Bid)
Infrastructure
Results
$3,312,439 CJ est. value
New Orleans, LA 70112

Norman Playground Phase II
Infrastructure
Results
$295,500 CJ est. value
New Orleans, LA 70131

Holy Angels Hotel
New Construction - 45,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
New Orleans, LA 70117

3401 Saint Charles Avenue Mixed-Use Development
New Construction, Infrastructure - 19,000 SF
Pending Verification
$30,000,000 CJ est. value
New Orleans, LA 70115

2230 Magazine Mixed-Use
New Construction, Infrastructure - 15,000 SF
Pending Verification
$4,000,000 CJ est. value
New Orleans, LA 70130

Airfield Rehabilitation Program - Runway 11-29 - City of New Orleans
Infrastructure
Conception
$42,000,000 CJ est. value
New Orleans, LA 70130

Mixed-Use District Around Ernest N. Morial Convention Center / New Orleans
New Construction, Infrastructure
Design
$557,000,000 CJ est. value
New Orleans, LA 70130

Last Updated 12/05/2022 06:16 PM
Project Title

Convention Center Boulevard / Hotel

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70130   (Orleans County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 5, 2022 the project is under consideration by the city's Historic Landmark Commission and was most recently heard November 2, 2022, but the commission is requesting more information. Information regarding a general contractor and construction schedule has not been confirmed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories Above Grade, 18,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents