Similar Projects
Address Pavement Condition of Wendell H. Ford Western Ky Parkway Cardinal Direction(S)
Infrastructure
Conception
$1,000,000 est. value
Leitchfield, KY 42755

Address Pavement Condition of Edward T. Breathitt Pennyrile Parkway Both Direction(S)
Infrastructure
Conception
$1,750,000 est. value
Hopkinsville, KY 42240

UAW Office/Storage Building
New Construction, Addition, Infrastructure - 64,596 SF
Design
$7,000,000 est. value
Louisville, KY 40245

SOF MOUT Site Expansion - Fort Campbell
New Construction, Infrastructure - 5,000 SF
Design
$5,000,000 CJ est. value
Fort Campbell, KY 42223

New Park East Lane Phase 1
Infrastructure
Bidding
$450,000 est. value
Scottsville, KY 42164

Vine Grove Optimist Park Roadway Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Vine Grove, KY 40175

Snow Removal and Road De-Icing Services
Term Contract, Alteration
Post-Bid
KY

Waterline Replacement in Beauty and Lovely Areas
Post-Bid
Prestonsburg, KY

Asphalt
Results
Danville, KY

Independence 2021 Resurfacing Program
Results
Less than $686,950 est. value
Independence, KY

Tucker Station Road Industrial Development
New Construction, Infrastructure - 932,000 SF
Pending Verification
$100,500,000 CJ est. value
Louisville, KY 40299

Blankenbaker Station II Lot 2
Addition, Infrastructure - 84,000 SF
Pending Verification
$9,000,000 CJ est. value
Louisville, KY 40299

Address Pavement Condition of I-64 Both Direction(S)
Alteration
Conception
$5,250,000 est. value
Winchester, KY 40391

Hopkins County Maintenance Garage - Construction
New Construction, Infrastructure, Renovation - 21,000 SF
Bidding
$317,300 CJ est. value
Madisonville, KY 42431

Gas and Water Utility Relocation
Post-Bid
Grayson, KY

Last Updated 07/27/2022 11:28 PM
Project Title

Eddie Prater Slide High Priority AML Project

Physical Address View project details and contacts
City, State (County) Salyersville, KY 41465   (Magoffin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Eddie Prater site is located at 565 Roanne Road in Salyersville, KY, 41465. Eddie's slide is located at coordinates Lat 37 36 ' 49.18", Long 83 02' 15.48". On November 12, 2021 a portion of the hillside at Eddie Prater's residence became unstable and slid down the hill side. The slide area is approximately 250 feet by 141 feet. Eddie Prater is concerned about the slide moving and the trees falling on his outside building. Also, he is concerned about the safety of the county road above the slide blocking the home on the hill, if the slide is not addressed. To address this concern, the slide area will be stripped to bedrock to remove the threat of more sliding. Once the two outside buildings are moved closer to the cabin above the side area. All excavated earthen material will be placed in an offsite waste area (abandoned sediment pond.) A temporary low water crossing will be installed on the property, to access the slide as shown on the plan view. Sub drains will be constructed along the two coal seams and extended to the creek to drain the water off the slide area and Eddie's property. Work will be done on the Roanne Road going off on to Roanne Spur Road to allow for the trucks to turn around as shown on the plan view. Roanne Spur Road will be used to access the slide area from the top. Roanne Spur Road will be moved back on to solid rock, due to the slide area under cutting it. Guard railing and guard lagging will be used to stabilize Roanne Spur Road and protect the landowner. The cost estimate for this work includes plan quantity for the earthwork and additional items for site prep, revegetation, and roadway stone for the county roads included in the cost estimate. In total, the project area encompasses approximately 2.0 acres behind the house of Eddie Prater as marked on the plans. All trees and root balls will be burned on Eddie Prater's property. This project will directly disturb the stream, but no permit is needed for temporary low water crossing to access the slide. This project will not address underground mine openings. Trees (1.0 acre) will be disturbed outside of the unstable landslide area; Bat Fund Mitigation will be utilized for this project. All areas disturbed by this project will be revegetated by means of the Standard AML Reclamation Seed Mixture. A quantity of Hydro mulching/Hydro seeding has been included to address revegetation of suitable portions of the landslide area following excavation. Cover crop is also provided in order to provide quick vegetative cover on any disturbed areas that will go undisturbed for at least two weeks, but not be ready for application of permanent revegetation. Sediment control will be provided by silt fences or straw bales along the Creek bank and other areas as needed. Estimated Length of Project: (Substantial Completion) + 120 Calendar Days (Final Completion)

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents